My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/16/1980
CBCC
>
Meetings
>
1980's
>
1980
>
7/16/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 12:11:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/16/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />R(I II <br />AW11R1 1ICT Fr]1 <br />ORDER <br />CONTRMAOR I)d <br />Fitt' ❑ <br />AIA DOCUMENT 0701 <br />OTHER <br />i'RO)ECT: Indian River County Admin. CHANG1 ORULR NUNIBLR. 3 <br />(name. address) Bldg. Renov. <br />TO (Contractor) <br />Reinhold Construction, Inc <br />ARCf IITF('T'S I'ROIFCT NO: 9363 <br />CONTRACT FOR: Construction <br />L J CONTRACT DATE: April 2, 1980 <br />You are directed to make the following changes in this Contract <br />Install existing fan coil unit in Room #203. <br />This proposal was void on June 26, 1980 by county commission in <br />reference to the letter dated June 26, 1980 from Hercules Kontoulas. <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . $ 2,748,000 00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . S 2,228 09 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . S 2,750,228 09 <br />The Contract Sum will be ( ) (decjzu" (unchanged) by this Change Order . . . $ 0 .00 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . $ 2, 750, 228.09 <br />The Contract Time will be soa+ed "I m peas) (unchanged) by ( 0 ) Das.. <br />The Date of Completion as of the date of this Change Order therefore is Not Changed <br />Connell. Metcalf & Eddy _ Reinhold Const. Inc. Indian River County Comm. <br />ARCHITECT CONTRACTOR -- <\ N -- -- <br />1320 S. Dixie Ilwy. P.O. Box 666 TVS 14th Ave. <br />Addwss Addis•., Addw• <br />Coral Gables, FL 33134 Cocoa, FL 32922 Vero Beach, FL 32960 <br />B`�`�"��.- V — -.- •� IIYV t"I .._. ..__ msµ- I .�� Y <br />DATE Jul 2 1980 DAfF _��D ATE ✓ 7' �6_�Ln <br />AIA DOCUMENT 0701 ' cimm;r oRnfR • APRII 14'0111111(1\ • AIA • 10 1970 • THE <br />AMMICAN INSIIIC IE Of Akr.11 ILLS, 17JS NILV YORK A\L , MV, WASM-IGION. U C. 21X6 <br />0%1 1'st.l <br />MR. KONTOULAS EXPECTS TO HAVE A CHANGE PROPOSAL ON THE <br />ELECTRICAL WORK AT THE ADMINISTRATION BUILDING. HE CONTINUED THAT <br />THE GENERATOR CHANGE PROPOSAL IS VERY IMPORTANT, AS $3,800 IS INVOLVED, <br />BUT HE STILL DID NOT HAVE THE CHANGE ORDER NUMBER IN ORDER TO INSTRUCT <br />THE CONTRACTOR. MR. KONTOULAS STATED THAT THE BID FOR RENOVATING <br />THE GENERATOR WAS GOOD FOR 30 DAYS, BUT THE TIME HAS NOW PASSED. HE <br />THEN GAVE A BRIEF PROGRESS REPORT: THE WEST WING IS PROCEEDING; <br />THE SECTION FOR THE SUPERVISOR OF ELECTIONS IS GUTTED OUT, AND WORK <br />IN THAT AREA WILL BE STARTING SOON. THE DEMOLISHING IS CONTINUING <br />AND WORKING WESTWARD; REINHOLD HAS ABOUT 30 MEN WORKING, THE <br />ELECTRICIANS HAVE 10 TO 12 MEN, AND 4 TO 6 MEN ARE WORKING ON AIR <br />CONDITIONING. MR. KONTOULAS CAUTIONED THE MEN ABOUT KEEPING A CERTAIN <br />TREE ALIVE ON THE PREMISES. HE ADDED THAT THE ROOFERS HAVE FINISHED <br />THE FLASHING ON THE THIRD FLOOR. MR. KONTOULAS EXPLAINED THAT THERE <br />WERE TWO SEVERE CASES OF CONCRETE BEAMS BEING CHOPPED OUT, SO HE <br />HAS INSTRUCTED THE CONTRACTOR NOT TO LOAD THIS AREA WITH GRAVEL UNTIL <br />IT HAS BEEN REPAIRED. <br />JUL 101980 33 BEAU 1FIAGE 81 <br />
The URL can be used to link to this page
Your browser does not support the video tag.