My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/30/1980
CBCC
>
Meetings
>
1980's
>
1980
>
7/30/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 12:13:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/30/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 3 01990 <br />-I <br />600K 44 PAG446 <br />COMMISSIONER LYONS STATED THAT HE WOULD AMEND HIS MOTION <br />TO STATE THAT IT IS THE INTENT OF THE BOARD THAT 6TH AVENUE WILL <br />DEAD-END AT U.S.1 WHEN 8TH STREET IS OPENED UP, AND COMMISSIONER <br />LOY AGREED. <br />THE CHAIRMAN CALLED FOR THE QUESTION. IT WAS VOTED ON AND <br />CARRIED UNANIMOUSLY. <br />COMMISSIONER LYONS REQUESTED THAT THE PLANNING DEPARTMENT <br />BE INSTRUCTED TO INCLUDE THE PROPOSED PLAN FOR 8TH STREET ON THE <br />PLANNING MAP. <br />COMMISSIONER LYONS NEXT WISHED TO AUTHORIZE THE ADMINISTRATOR <br />TO GET THE SIGNALIZATION AT U.S. 1 AND 8TH STREET CHANGED FROM THAT <br />REQUIRED FOR A "T" INTERSECTION. <br />COMMISSIONER LOY FELT WE SHOULD JUST LET THE ADMINISTRATOR <br />CHECK UP ON THE PROPER WAY TO HANDLE THIS, AND COMMISSIONER LYONS <br />AGREED, NOTING THAT HE JUST WANTED IT ALL TIED UP IN ONE PACKAGE. <br />DISCUSSION RE BIDS RECEIVEDJULY 29TH FOR CONSTRUCTION AT <br />WABASSO BEACH PARK, PHASE A <br />SENIOR PLANNER DAVID MARSH AND ENGINEER .JOHN ROBBINS WERE <br />PRESENT AND EXPLAINED THAT THESE BIDS ON PHASE A WERE JUST RECEIVED <br />YESTERDAY. MR. MARSH INFORMED THE BOARD THAT PHASE A INCLUDES THE <br />BOARDWALK, TWO ADDITIONAL WALKOVERS, THE GAZEBO, THE LIFEGUARD STAND, <br />AND THE ADDITIONAL RAMP FOR THE HANDICAPPED. HE NOTED THAT THE BID <br />RECEIVED WAS APPROXIMATELY $15,000 OVER THE ENGINEERING ESTIMATE FOR <br />THAT PORTION OF THE PROJECT. IT ALSO WAS CONSIDERABLY OVER THEIR <br />INITIAL ESTIMATES WHICH WERE DONE APPROXIMATELY A YEAR AGO. HE FELT <br />THE BIGGEST DISCREPANCY IS ON THE BOARDWALK AND GAZEBO PORTION OF THE <br />PROJECT. MR. MARSH STATED THAT HE AND MR. ROBBINS ARE BOTH INDICATING <br />THAT THE COMMISSION MIGHT WANT TO CONSIDER REJECTING THE ONE BID <br />RECEIVED AND READVERTISING. THIS WILL DELAY MATTERS, BUT HE DID NOT <br />BELIEVE IT WOULD BE A CRITICAL DELAY. HE NOTED THAT SINCE IT APPEARS <br />OBVIOUS THAT WE ARE GOING TO GO QUITE A BIT OVER THE $75,000, THIS <br />WOULD GIVE THEM TIME TO GO BACK AND SEE WHAT WE WILL HAVE TO DROP OUT <br />OF THE PROJECT. <br />5= <br />
The URL can be used to link to this page
Your browser does not support the video tag.