Laserfiche WebLink
EDwin S. Schmudcer, P.E. <br />President <br />BleP%1 zMan's Work With Cod's World <br />July 18, 1980 <br />E:] <br />Board of County Commissioner <br />2145 14th Avenue <br />Room 115 <br />Vero Beach, Florida 32960 <br />ATT: Jack Jennings <br />Dear Mr. Jennings: <br />Post Office Boz 10 <br />Vero Beach, Florida 32960 <br />Telephone (305) 557-9360 <br />My client Dr. Fisher, has advised me that Mr. Pete Musick of Musick <br />and Fowler Land Surveying has been requested to simply revise the <br />lot lines to suit the road -way as constructed for Phase I of Sebastian <br />Springs. We feel that this should not prevent the actual extension <br />of the preliminary plat, as the changes are a minimum with relation <br />to the large lots being platted. <br />We would like to formally request that you extend the preliminary <br />plat on the basis that the final plat would show the actual variation <br />from the preliminary plat alignment. The surveyor should have this <br />in the next few months. <br />Sincerely, <br />TOTAL DEVELOP,�ENT , INC. <br />L� CZe(. <br />EdWi12 S. .Sc•hm ic,'.er, P. E. <br />President <br />ATTORNEY COLLINS AGREED THAT DR. FISCHER'S LETTER GOES A <br />LONG WAY TOWARDS RECONCILING THE DIFFICULTIES, BUT NOTED THAT THE <br />ROAD LOCATED ON THE LAND IS DIFFERENT THAN SHOWN ON THE TENTATIVE <br />PLAT, AND HE DID NOT WANT THE BOARD GRANTING AN EXTENSION OF SOMETHING <br />DIFFERENT FROM WHAT THEY ARE DOING. <br />COMMISSIONER LYONS FELT THAT THE DEPARTURE PROBABLY IS NOT <br />TOO GREAT, BUT STATED HE DID NOT LIKE THE SITUATION. <br />SENIOR PLANNER MARSH EXPLAINED THAT HIS STAFF DID NOT EXPRESS <br />TOO MUCH CONCERN BECAUSE THE ROAD IS JUST OFF A MATTER OF POSSIBLY <br />15' IN ONE AREA AND 5' OR 10' IN ANOTHER. <br />HARLAN PETERSON OF TOTAL DEVELOPMENT CONFIRMED THAT THE <br />ROAD WAS NOT VERY MUCH DIFFERENT THAN SHOWN ON THE PLAT. <br />63 <br />FAG <br />AUG 131980 Boa E� H <br />ACJ <br />� <br />My client Dr. Fisher, has advised me that Mr. Pete Musick of Musick <br />and Fowler Land Surveying has been requested to simply revise the <br />lot lines to suit the road -way as constructed for Phase I of Sebastian <br />Springs. We feel that this should not prevent the actual extension <br />of the preliminary plat, as the changes are a minimum with relation <br />to the large lots being platted. <br />We would like to formally request that you extend the preliminary <br />plat on the basis that the final plat would show the actual variation <br />from the preliminary plat alignment. The surveyor should have this <br />in the next few months. <br />Sincerely, <br />TOTAL DEVELOP,�ENT , INC. <br />L� CZe(. <br />EdWi12 S. .Sc•hm ic,'.er, P. E. <br />President <br />ATTORNEY COLLINS AGREED THAT DR. FISCHER'S LETTER GOES A <br />LONG WAY TOWARDS RECONCILING THE DIFFICULTIES, BUT NOTED THAT THE <br />ROAD LOCATED ON THE LAND IS DIFFERENT THAN SHOWN ON THE TENTATIVE <br />PLAT, AND HE DID NOT WANT THE BOARD GRANTING AN EXTENSION OF SOMETHING <br />DIFFERENT FROM WHAT THEY ARE DOING. <br />COMMISSIONER LYONS FELT THAT THE DEPARTURE PROBABLY IS NOT <br />TOO GREAT, BUT STATED HE DID NOT LIKE THE SITUATION. <br />SENIOR PLANNER MARSH EXPLAINED THAT HIS STAFF DID NOT EXPRESS <br />TOO MUCH CONCERN BECAUSE THE ROAD IS JUST OFF A MATTER OF POSSIBLY <br />15' IN ONE AREA AND 5' OR 10' IN ANOTHER. <br />HARLAN PETERSON OF TOTAL DEVELOPMENT CONFIRMED THAT THE <br />ROAD WAS NOT VERY MUCH DIFFERENT THAN SHOWN ON THE PLAT. <br />63 <br />FAG <br />AUG 131980 Boa E� H <br />