My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/08/2009
CBCC
>
Meetings
>
2000's
>
2009
>
09/08/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 11:15:36 AM
Creation date
10/1/2015 6:22:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
09/08/2009
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
4029
Book and Page
137, 858-916
Supplemental fields
SmeadsoftID
7376
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.0. TEMPORARYRESTRICTION OF USING INTERNET BROADCAST BYDEMAND <br />STAR FOR OBTAINING RESPONSES TO CCNA (CONSULTANTS <br />COMPETITIVE NEGOTIATIONACT) REQUESTS FOR ARCHITECTURAL AND <br />ENGINEERING DESIGN SER VICES <br />Commissioner Solari noted that subsequent to obtaining the original information on this <br />item, the Commissioners had received additional backup advising that if we go out for Request <br />for Qualifications (RFQ) not by Demand Star, that a requirement be included to obtain at least <br />eight (8) formal responses. <br />MOTION WAS MADE BY Commissioner Solari, <br />SECONDED by Vice Chairman Flescher, to approve <br />staff's recommendation, with the stipulation to require at <br />least eight (8) formal responses to a Request for <br />Qualifications. <br />A brief discussion ensued regarding the large volume of companies who are responding <br />to the County's RFQ's for design services. <br />Tom Frame, General Services Director, corroborated that significant responses were <br />being submitted statewide; he did not think there would be any problem with getting the required <br />RFQ's. <br />The Chairman CALLED THE QUESTION and the <br />Motion carried unanimously. The Board approved, based <br />on the current level of responses and given the dire level <br />of the construction industry, to temporarily forego <br />broadcasting Requests for Qualifications for professional <br />design services for a period of six (6) months, effective <br />10 <br />September 8, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.