My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/08/2009
CBCC
>
Meetings
>
2000's
>
2009
>
09/08/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 11:15:36 AM
Creation date
10/1/2015 6:22:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
09/08/2009
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
4029
Book and Page
137, 858-916
Supplemental fields
SmeadsoftID
7376
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#1 Serving the Barrier Island; Item #2 Serving the Town <br />oflndian River Shores; and Item #3 Eliminating the City's <br />wastewater plant and being served by the County; and (2) <br />approved extending to the City of Vero Beach and the <br />Town of Indian River Shores, an invitation to participate <br />in a Workshop Meeting on Wastewater, Water, and Reuse <br />Water, addressing the three areas enumerated above. <br />14.B. COMMISSIONER .JOSEPH E. FLESCHER-NONE <br />14. C. COMMISSIONER GARY C. WHEELER -NONE <br />14.D. COMMISIONER PETER D. OTRYAN <br />14.D. I. CDS MANUFACTURING PROJECT <br />Commissioner O'Bryan provided background information on his request to prepare an <br />Emergency Ordinance to allow a temporary use permit for a Florida DOT -approved Federal <br />Stimulus Project involving CDS Manufacturing, a Florida -based company that manufactures <br />prestress and precast concrete components. He described the site and detailed what would be <br />involved in the Project, noting that it would not be a concrete batch plan. He divulged that <br />according to CDS, the Project would create approximately forty jobs, of which all but five or six <br />would be filled locally, and conveyed that the total project would bring in $7 million to $7.5 <br />million over a 2 '/z year period, the vast majority of which would be spent in this County. <br />MOTION WAS MADE by Commissioner O'Bryan, <br />SECONDED by Commissioner Wheeler, to direct staff to <br />draft an Emergency Ordinance to permit a temporary use <br />permit for the CDS Manufacturing Project. <br />41 <br />September 8, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.