Laserfiche WebLink
COMMISSIONER WODTKE SUGGESTED ADDING THE STIPULATION THAT <br />IF THE CULVERTS ARE USABLE AND THE COUNTY NEEDS THEM, WE CAN GET THEM <br />BACK. <br />ASSISTANT ADMINISTRATOR NELSON COMMENTED THAT THERE IS <br />REALLY NO NEED FOR THEM IN OUR SYSTEM. <br />COMMISSIONER WODTKE THEN WITHDREW HIS SECOND. <br />COMMISSIONER DEESON THEN SECONDED THE MOTION. <br />THE CHAIRMAN CALLED FOR THE QUESTION. IT WAS VOTED ON AND <br />PASSED. <br />DISCUSSION RE LOCATION OF GIFFORD SEWER PLANT <br />JOHN ROBBINS, ENGINEER WITH THE JOINT VENTURE, APPROACHED <br />THE BOARD TO GIVE A STATUS REPORT ON HIS EFFORTS IN FINDING A HOME FOR <br />THE GIFFORD SEWER PLANT. HE THEN ADVISED THAT THE SOIL BORINGS <br />SHOULD BE COMPLETED TODAY OF THE WELLFORD HARDEE LAND - IT IS FINE <br />BROWN SAND WITH A LITTLE BIT OF CLAY. MR. ROBBINS CONTINUED THAT <br />THEY RAN EIGHT SOIL BORINGS OF 25' OVER 12 ACRES AT THE NORTHERN HALF <br />OF THE PROPERTY; PRELIMINARY FINDINGS INDICATE THAT THEY COULD GO <br />WITH PERCOLATION PONDS. HE STATED THAT HE TALKED WITH THE SOILS <br />PEOPLE ABOUT THEIR FIRST PERMEABILITY TEST, WHICH WAS A GOOD ONE; AND <br />THEY ARE PLANNING TO DO FOUR MORE AND WILL HAVE THOSE RESULTS LATER. <br />MR. ROBBINS THOUGHT THIS PROPERTY LOOKED LIKE A VERY GOOD SITE. HE <br />STATED THAT HE TALKED TO WELLFORD HARDEE, WHO SAID HE WOULD BE AMENABLE <br />TO A DISCUSSION OF TERMS WITH THE COUNTY. MR. ROBBINS THEN RECOMMENDED <br />THAT MR. HARDEE'S WELL BE ABANDONED AND THAT THE COUNTY REQUEST THAT <br />HE CONNECT TO THE GIFFORD WATER SYSTEM; ALSO THE IMPACT FEES THAT <br />UTILITIES DIRECTOR LINER SHOWED HIM, MAKES THIS RECOMMENDATION <br />ECONOMICALLY FEASIBLE. HE CONCLUDED BY ADVISING THAT HE SHOULD HAVE <br />A FULL BLOWN REPORT AT THE NEXT MEETING WHICH WILL INCLUDE THE ACREAGE <br />REQUIREMENTS AND DESIGN FOR THE PERCOLATION PONDS. <br />ATTORNEY COLLINS ADVISED THAT THERE HAS BEEN SOME DISCUSSION <br />OF THE PURCHASE PRICE, AND THE ABILITY TO COMBINE THE TAPPING IN OF <br />THE WATER IS A FACTOR THAT WOULD AFFECT THE PURCHASE PRICE. <br />19 <br />AUG 2'719 0 Boos 4 F°AG- 366 <br />