My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/27/1980 (2)
CBCC
>
Meetings
>
1980's
>
1980
>
8/27/1980 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:54 AM
Creation date
6/11/2015 12:18:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/27/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMISSIONER LYONS INFORMED THE BOARD THAT HE HAS BEEN <br />CONVINCED THAT THE COST FOR HIS SUGGESTED CHANGE IN THE CONFERENCE <br />ROOM ON THE THIRD FLOOR,WHICH INVOLVED ADDING ANOTHER DOOR, IS TOO <br />GREAT. <br />MR. KONTOULAS THEN GAVE THE FOLLOWING PROGRESS REPORT. <br />THE BIG NEWS AT THE COURTHOUSE IS THAT THE TELEPHONE POLE ON THE WEST <br />SIDE HAS BEEN REMOVED WHICH ALLOWS CONSTRUCTION OF THE SECOND FLOOR <br />WALKWAY. THE NEW GROUND TRANSFORMER HAS BEEN ACTIVATED FOR THE <br />COURTHOUSE ONLY. MR. KONTOULAS REPORTED THAT HE HAS RECEIVED WORD THAT <br />SOMETIME IN OCTOBER THE ANNEX WILL BE CUT OFF ELECTRICALLY FOR EIGHT <br />HOURS. THE CONTRACTOR WILL GIVE US SPECIFIC ADVANCE WARNING ABOUT <br />THIS AND WILL APPROACH EACH DEPARTMENT IN REGARD TO THE DATE. MR. <br />KONTOULAS CONTINUED THAT THERE IS VERY LITTLE BEING DONE INSIDE THE <br />COURTHOUSE. THE ELECTRICAL WORK IS BEING CONTINUED, BUT NO FINISHING <br />OR PATCHING, WHICH HE FOUND DISAPPOINTING. AT THE ADMINISTRATION <br />BUILDING, THE EXTERIOR IS GOING ALONG REAL WELL AND THE WORK ON THE <br />PARKING LOTS; THEY ARE DOING BEARING TESTS AND THE CONTRACTOR IS CLEARING <br />FOR SIDEWALKS AROUND THE PERIMETER OF THE EAST PARKING LOT. INSIDE, <br />THE PLUMBERS ARE STILL WORKING IN THE WEST WINGS. MECHANICALLY THERE <br />IS SOME MINOR DUCT WORK BEING DONE. THE STUD MAN IS WORKING ON THE <br />THIRD FLOOR AND IS INSTALLING A DROPPED CEILING. VERY LITTLE FINISHING <br />HAS BEEN DONE. MR. KONTOULAS EXPLAINED THAT THEY ARE WAITING TO <br />RECEIVE DOOR FRAMES AND THE CONTRACTOR INFORMED HIM ON MONDAY THAT HE <br />SHOULD HAVE HAD A DELIVERY OF DOOR FRAMES THE WEEK OF THE 25TH. THAT <br />IS THE HOLD-UP IN BOTH JOBS IN TRYING TO ADVANCE THE FINISHING PORTION. <br />IN REGARD TO THE ANNEX BEING WITHOUT POWER FOR EIGHT HOURS, <br />COMMISSIONER LYONS ASKED IF IT WOULD BE CHEAPER FOR US TO SHUT DOWN <br />A DAY OR TO HAVE THE CONTRACTOR WORK OVER TIME. <br />MR, KONTOULAS EXPLAINED EXACTLY WHAT THE CHANGEOVER OF THE <br />ELECTRICITY WOULD INVOLVE, AND POINTED OUT THAT IT MUST BE DONE IN <br />CONJUNCTION WITH THE CITY CREWS. HE ASSURED THE BOARD THAT EIGHT <br />HOURS IS THE MINIMUM NECESSARY TO MAKE THE CHANGE OVER. <br />33 <br />AUG 2 71980 <br />Boa 44 PAGE 380 H <br />
The URL can be used to link to this page
Your browser does not support the video tag.