Laserfiche WebLink
AUG 2 71980 <br />�� <br />BOOK 44 PACE 393 <br />COMMISSIONER WODTKE RETURNED TO THE MEETING AT 3:05 O'CLOCK <br />MR. MARSH RECAPPED THAT PHASE A (WHICH INCLUDES THE BOARD- <br />WALK, HANDICAPPED RAMP, GAZEBO, WALKOVERS AND THE LIFEGUARD STATION) <br />PLUS THE $21,550 ALREADY COMMITTED TO THIS PROJECT, WOULD LEAVE A <br />BALANCE OF A LITTLE OVER $5,000, ASSUMING THAT THERE IS $75,000 AVAIL- <br />ABLE. BASED ON THAT ASSUMPTION AND THE ASSUMPTION THAT THE COUNTY <br />WILL DEVELOP THE RESTROOM FACILITIES WITH THEIR OWN CREWS, THEY ARE <br />ESTIMATING A $37,000 DEFICIT. IF, HOWEVER, THE COUNTY HAS ALLOCATED <br />$50,000 TO THIS PROJECT INSTEAD OF $32,000 AS THEY HAD THOUGHT, THEY <br />WOULD ESTIMATE A $20,000 DEFICIT; IN OTHER WORDS, ACCORDING TO THE <br />AMOUNT OF MONEY ALLOCATED TO THE PROJECT, THEY COME UP WITH EITHER A <br />$37,000 OR $20,000 DEFICIT. <br />COMMISSIONER LYONS STATED HE WOULD LIKE TO SEE THEM TRY <br />TO COME OUT EVEN AND ASKED WHERE WE COULD CUT BACK $20,000 AND STILL <br />HAVE A WORKABLE PARK, <br />MR. MARSH BELIEVED THE LANDSCAPING COULD BE CUT BACK $4,000 <br />OR $5,000. HE NOTED THAT ONE OF THE BIGGEST REASONS FOR THE COST <br />DEFICIT IS THE RESTROOMS, WHICH ARE MUCH MORE COSTLY BECAUSE THEY HAVE <br />CONCENTRATED ON MAKING THEM VANDALPROOF. THEY ARE A CADILLAC CONSTRUC- <br />TION IN TERMS OF SECURITY, AND THEY ALSO HAVE LIMITED MAINTENANCE. <br />COMMISSIONER LYONS FELT THAT MAY BE A SAVING IN THE LONG <br />RUN AND HE DID NOT HAVE ANY PROBLEM WITH SPENDING MORE ON THE RESTROOM <br />FACILITIES. <br />MR. MARSH CONTINUED THAT ANOTHER REASON FOR THE DEFICIT IS <br />HE IS NOT AN ENGINEER AND HE CAME UP WITH SOME LOW ESTIMATES TO BEGIN <br />WITH. THE ENGINEERING CAME INTO THE PICTURE WHEN THEY REALIZED THAT <br />THE STATE WAS GOING TO BE PRETTY PICKY ABOUT WHAT THEY DID AND WE HAD <br />TO HAVE AS DETAILED PLANS AS POSSIBLE. <br />DISCUSSION FOLLOWED AS TO PRIORITIES AND VARIOUS ALTERNATIVES <br />FOR CUTTING BACK, INCLUDING ELIMINATING THE NORTHERNMOST CROSSOVER <br />AND POSSIBLY CUTTING BACK SOME ON THE CONSTRUCTION OF THE RESTROOMS, <br />I.E., REPLACING THE STAINLESS STEEL STALLS WITH CONCRETE BLOCK <br />CONSTRUCTION. <br />