My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/05/2010 (3)
CBCC
>
Meetings
>
2010's
>
2010
>
01/05/2010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2018 3:37:01 PM
Creation date
10/1/2015 6:24:23 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
01/05/2010
Meeting Body
Board of County Commissioners
Book and Page
138, 562-606
Supplemental fields
SmeadsoftID
8169
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Polackwich, during which he would work for a short time concurrently with Attorney Collins. <br />Director Sexton divulged that a total package of $175,000 would be offered, with the contract <br />terms to be ironed out with the candidate; after which, he (Director Sexton) would return with <br />the employment contract at the January 19, 2010 Board of County Commission meeting. <br />12. E. HUMAN SERVICES -NONE <br />12. F. LEISURE SERVICES -NONE <br />12. G. OFFICE OF MANAGEMENT AND BUDGET -NONE <br />12.H. RECREATION -NONE <br />12.1. PUBLIC WORKS <br />12.1.1. STAFF UPDATE — SECTOR 3 BEACH RENOURISHMENT PROJECT <br />Coastal Resource Manager Jonathan Gorham advised that staff was currently finalizing <br />both permit and contract items for the construction of Phase I of the Sector 3 Beach Restoration <br />Project, with February 1, 2010, as the anticipated start date. He reported that the Florida <br />Department of Environmental Protection (FDEP) issued a Notice of Completeness for the Sector <br />3 State Permit application on December 22, 2009, and has committed to issuing the County's <br />Draft Permit and Notice of Intent to Issue (NOITI) by January 8, 2010. He noted that one more <br />item, a Preconstruction Conference (which is being scheduled), is required prior to the FDEP's <br />issuance of the Notice To Proceed. He also conveyed that the Erosion Control Line (ECL) <br />process would be completed by February 1, 2010. Dr. Gorham stated that staff would, at a future <br />date, be coming forward with several contractual items for Board approval, including a Contract <br />Award to Ranger Construction and some Change Orders to reflect changes in the work since the <br />Project was bid. <br />22 <br />January 5, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.