My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/24/1980 (2)
CBCC
>
Meetings
>
1980's
>
1980
>
9/24/1980 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:54 AM
Creation date
6/11/2015 12:25:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Fire Commissioners
Document Type
Minutes
Meeting Date
09/24/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 2 419$0 B06K 44 PAGE 664 <br />'I N 151 <br />ATTORNEY COLLINS INFORMED THE BOARD THAT WE ARE GOING TO <br />NEED AN ENGINEERING REPORT WITH ALLOCATED COSTS FOR BOTH NORTH AND <br />SOUTH OF THE MOORINGS IN ORDER TO PLAN THE BOND ISSUE FOR SOUTH OF <br />THE MOORINGS AND GIVE THE DEVELOPERS SOME CONCRETE FACTS AND COSTS. <br />CHAIRMAN SIEBERT INQUIRED ABOUT THE AMOUNT OF MONEY THAT <br />WOULD BE NEEDED FOR SUCH AN ENGINEERING REPORT. <br />ATTORNEY COLLINS EXPLAINED THAT THE MONEY NEEDED FOR THE <br />PORTION OF THE LAND SOUTH OF THE MOORINGS CAN BE PAID OUT OF THE <br />SOUTH BEACH MUNICIPAL SERVICE FUND. <br />ENGINEER ROBBINS FELT TO DO THIS CORRECTLY, THEY WOULD RUN <br />A LITTLE COMPUTER PROGRAM ON IT AND MAKE SURE THAT IT IS COMPATIBLE <br />WITH THE CITY OF VERO BEACH. HE MADE A ROUGH ESTIMATE OF $1.,200 <br />TO $1,500 FOR THE REPORT. <br />ATTORNEY COLLINS BELIEVED THE ENGINEERING REPORT NEEDS TO <br />BE COMPLETED AND REVIEWED WITH THE CITY OF VERO BEACH AND THEN <br />BROUGHT BACK TO THE BOARD, AFTER WHICH WE CAN GO TO THE DEVELOPERS. <br />ON MOTION BY COMMISSIONER LYONS, SECONDED BY COMMISSIONER <br />LOY, THE BOARD UNANIMOUSLY AUTHORIZED THE ENGINEER TO PUT TOGETHER <br />A REPORT ON THE ENGINEERING OF THE SOUTH BEACH WATER LINE, TO MEET <br />WITH THE CITY OF VERO BEACH REGARDING SAME, AND BRING BACK RECOMMEN- <br />DATIONS. <br />CHAIRMAN SIEBERT SUGGESTED THAT THEY MIGHT WANT TO MEET <br />WITH THE DEVELOPERS AS WELL AS THE CITY OF VERO BEACH SO THEY COULD <br />HAVE SOME INPUT. <br />ATTORNEY COLLINS REPORTED THAT WHAT HAS HAPPENED IS THAT <br />THE AGREEMENT THE BOARD HAS IN THEIR PACKET HAD ATTACHED TO IT AN <br />ADDENDUM THAT SETS OUT CAPACITY CHARGES AND RATE CHARGES. HE CON- <br />TINUED THAT BOTH ENGINEER ROBBINS AND UTILITY DIRECTOR LINER HAVE <br />SPENT SOME TIME GOING OVER THE ADDENDUM BUT HAVE NOT TALKED WITH <br />THE CITY YET AS TO WHAT IT MEANS. AS TO THE AGREEMENT IN THE PACKET, <br />HE STATED THEY WOULD LIKE TO HAVE CONCEPTUAL APPROVAL OF THAT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.