My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/02/2010
CBCC
>
Meetings
>
2010's
>
2010
>
02/02/2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2018 3:49:27 PM
Creation date
10/1/2015 6:24:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
02/02/2010
Meeting Body
Board of County Commissioners
Book and Page
138, 676-733
Supplemental fields
SmeadsoftID
8175
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.H. SELECTION OF PROFESSIONAL ENGINEERING FIRMS TO PROVIDE <br />GEOTECHNICAL SERVICES ONANANNUAL SERVICES CONTRACT <br />ON MOTION by Commissioner Davis, SECONDED by <br />Vice Chairman Solari, the Board unanimously approved <br />the following firms for the Geotechnical Engineering <br />Services Annual Services Contract: (1) Dunkelberger <br />Engineering and Testing, Inc., Port St. Lucie; (2) Ardaman <br />and Associates, Inc., Port St. Lucie; (3) AM Engineering <br />and Testing Inc., Port St. Lucie; (4) Universal Engineering <br />Sciences, Inc., Ft. Pierce; and (5) K.S.M. Engineering and <br />Testing, Inc., Sebastian; and authorized staff to continue <br />contract negotiations on behalf of the County with the <br />selected firms, as recommended in the memorandum of <br />January 19, 2010. <br />8.1. AMENDMENT NO. 1 TO WORK ORDER No. 11 TO THE PROFESSIONAL <br />BRIDGE DESIGN SERVICES AGREEMENT WITH BRIDGE DESIGN <br />ASSOCIATES, INC. FOR PEDESTRIAN BRIDGE OVER 14TH STREET CANAL, <br />IRC PROJECT #0745 <br />ON MOTION by Commissioner Davis, SECONDED by <br />Vice Chairman Solari, the Board unanimously approved <br />Amendment No. 1 to Work Order No. 11 (Engineering) <br />with Bridge Design Associates, Inc., authorized the <br />project as outlined in the Scope of Services, and <br />authorized the Chairman to execute same, for a lump sum <br />fee of $5,070.00, as recommended in the memorandum of <br />January 6, 2010. <br />12 <br />February 2, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.