My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/01/2014 (2)
CBCC
>
Meetings
>
2010's
>
2014
>
04/01/2014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 3:10:35 PM
Creation date
10/1/2015 6:33:45 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/01/2014
Meeting Body
Board of County Commissioners
Book and Page
572
Supplemental fields
SmeadsoftID
14727
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 provides a complete breakdown of all technical revisions made to the Utility <br />Construction Standards on a drawing by drawing and section by section basis. The intent and technical <br />integrity of the document remains intact, and all revisions are considered to be clarifications. The revised <br />standards will be incorporated into the Indian River County Website, (www.ircutilities.com) and are available <br />for downloading in a PDF format. Navigate to the Utility Department and follow the link to Water and <br />Wastewater Standards. <br />TECHNICAL MODIFICATIONS TO <br />WATER, WASTEWATER & RECLAIMED WATER <br />CONSTRUCTION STANDARDS — FEBRUARY 2014 <br />II, DETAIL DRAWINGS <br />W-1— FIRE HYDRANT AND VALVES (LOCATION DETAIL), add to Notes 6. BRINE — BROWN <br />W-2 —FIRE HYDRANT NOTES, revise Notes 9. Maintain 6' radius... to Maintain 7'-6" radius... <br />W-3 -- MANUAL 2" BLOW OFF, revise drawing, removed 2" corporation stop and meter, 2" radio read <br />W-4 WATER SERVICE, revise drawing, included pre -plumbed water meter <br />W-5 — Revise Number from W -4A to W -5 -WATER SERVICE (OUTSIDE OF RIGHT OF WAY), revise drawing, <br />included pre -plumbed water meter <br />W-6 — Revise Number from W-5 to W -6 -METER BOX, revise drawing, included pre -plumbed water <br />meter <br />W-7 —TYPICAL PRE -PLUMBER METER BOX, New drawing that depicts pre -plumbed water meter <br />W-8 - Revise Number from W-6 to W -8 -TEMPORARY SAMPLING POINT <br />W-9 - Revise Number from W-7 to W -9 -FLUSHING CONNECTION <br />W-10 - Revise Number from W-8 to W -10 -DOUBLE -DETECTOR CHECK VALVE ASSEMBLY, add gate <br />valve between water main and check valve. <br />W-11- Revise Number from W-9 to W -I I -BACKFLOW PREVENTER <br />W-12 - Revise Number from. W-10 to W -12 -MASTER METER COMBINATION ASSEMBLY, revised note <br />2 and add note 6, add gate valve to drawing, add commercial grade fiber mesh concrete note <br />W-8 - Revise Number from W-12 to W -13 -TEMPORARY JUMPER DETAIL, add note 5. <br />W-8 - Revise Number from W -12A to W- I 4 -TEMPORARY JUMPER DETAIL NOTES <br />R-1 - Revise Number from W-11 to R -I -- REUSE METERNALVE (ASSEMBLY DETAIL), add commercial <br />grade fiber mesh concrete note <br />R-2 - Revise Number from W -1 1A to R-2 — REUSE PIPE (DISCHARGE DETAIL) <br />S-1- Revise Note 5 — See S -2A to read S-3 <br />F:jUtilities\UTILITY—CONSTRUCTION STANDARDS1Revision 2014\Agenda Item March 2014 <br />119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.