Laserfiche WebLink
THE PROPERTY AND THE JOB SCHEDULE. <br />MR. LINER UNDERSTOOD THAT THE <br />DER WAS GOING TO HOLD THE COUNTY TO THE ORIGINAL CONSTRUCTION PERMIT, <br />WHICH WOULD MEAN THAT THE WORK MUST BE COMPLETED BY DECEMBER. HE <br />ADDED THAT THIS WOULD BE VERY DIFFICULT TO GET ALL THE PAPER WORK <br />DONE WITHIN THAT SCHEDULED PERIOD OF TIME. MR. LINER COMMENTED THAT <br />IF THE USE OF THE FACILITIES WERE FOR 100,000 GALLONS A DAY, THE <br />SEWAGE TREATMENT PLANT WOULD USE SURGE TANKS, WHICH PROVIDES THE MOST <br />EFFICIENT TREATMENT. HE EXPLAINED THAT THIS WOULD BE QUALITY TREATMENT <br />WITH 98% REMOVAL OF SOLIDS, WHICH WOULD THEN GO THROUGH FILTERS, AND <br />FINALLY TO PERCOLATION. <br />ENGINEER JOHN ROBBINS APPROACHED THE BOARD AND DISPLAYED <br />AN AERIAL PHOTO AND POINTED OUT WHERE THE SUBJECT SITE WAS IN RELATION- <br />SHIP TO EXISTING FACILITIES. HE NOTED THAT THE AREA AROUND THE <br />PROPOSED SITE WAS ALL AGRICULTURAL. MR, ROBBINS INFORMED THE BOARD <br />THAT BILL BOSTWICK, OF THE DEPARTMENT OF ENVIRONMENTAL REGULATION, <br />VISITED THE SITE; THEY REVIEWED DATA FROM BORINGS TO A DEPTH OF 40', <br />AND PERCOLATION TESTS, THE DER DID TOUR THE SURROUNDING AREAS AND <br />BASICALLY GAVE A GREEN LIGHT FOR EFFLUENT DISPOSAL ON THE SITE AND <br />FOR THE LOCATION OF THE TREATMENT PLANT. <br />THE CHAIRMAN ASKED IF ANYONE IN THE AUDIENCE WISHED TO SPEAK. <br />ANN ROBINSON, INTERESTED CITIZEN, ASKED WHERE THE TREATMENT <br />PLANT WAS ORIGINALLY PLANNED, AND MR, ROBBINS ADVISED THAT IT WAS TO <br />HAVE BEEN LOCATED ON KINGS HIGHWAY, SHE AGREED THAT THE SITE ON <br />LINDSEY ROAD APPEARED TO BE A FAR SUPERIOR SITE. <br />COMMISSIONER LYONS REPORTED THAT THERE WAS A SEWAGE TREAT- <br />MENT PLANT FOR THE TRAILER PARK ADJOINING THIS PROPERTY WHICH WILL <br />BE DEACTIVATED; ALSO THERE IS A WELL TO BE DEACTIVATED ON THE WEST <br />SIDE OF THE PROPERTY THAT EXISTS ON THE COUNTY'S SEWAGE TREATMENT <br />SITE. COMMISSIONER LYONS COMMENTED THAT THIS IS GOING TO REPLACE AN <br />INOPERATIVE SEWER PLANT WHICH HAS BEEN A CONSTANT SOURCE OF PROBLEMS <br />TO THE COUNTY, AND THE SOONER THE SEWAGE CAN BE PROPERLY TREATED, <br />I <br />THE HAPPIER THE BOARD WOULD BE, <br />OCT 81980 <br />bL <br />41 -BOOS( 44 PAGE 841 <br />