My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/18/2010 (2)
CBCC
>
Meetings
>
2010's
>
2010
>
05/18/2010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 4:21:43 PM
Creation date
10/1/2015 6:25:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
05/18/2010
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
4040
Book and Page
139, 358-393
Supplemental fields
SmeadsoftID
8798
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.F. OSLO ROAD IMPROVEMENTS PHASE II, BETWEEN 43RD AVENUE AND 27TH <br />AVENUE, CUMBERLAND FARMS — GEOSYNTEC CONSULTANTS, INC., <br />WORK ORDER No. 27 - SITE ASSESSMENT, CLEAN UP AND CLOSURE <br />ON MOTION by Commissioner Flescher, SECONDED <br />by Commissioner Davis, the Board unanimously: <br />(1) approved Work Order No. 27 (Engineering), with <br />Geosyntec Consultants, Inc.; (2) authorized the project as <br />outlined in the Scope of Services under Attachments A <br />and B; and (3) authorized the Chairman to execute the <br />Work Order for the not -to -exceed amount of $13,797.00, <br />as recommended in the memorandum of May 5, 2010. <br />AGREEMENT ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />8.G. APPROVAL WORK ORDER No. 17 - BRIDGE DESIGN ASSOCIATES, INC., <br />PEDESTRIAN BRIDGE — OLD DIXIE HIGHWAY SIDEWALK FROM 38TH LANE <br />TO 65TH STREET, IRC PROJECT No. 0845 <br />ON MOTION by Commissioner Flescher, SECONDED <br />by Commissioner Davis, the Board unanimously: <br />(1) approved Work Order No. 17 (Engineering) with <br />Bridge Design Associates, Inc.; (2) authorized the project <br />as outlined in the Scope of Services; and (3) authorized <br />the Chairman to execute the Work Order for the lump sum <br />fee of $18,315.00, as recommended in the memorandum <br />of May 11, 2010. <br />8 <br />May 18, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.