Laserfiche WebLink
8.W. WORK ORDER No. 22 21 TO THE PROFESSIONAL BRIDGE DESIGN <br />SERVICES AGREEMENT WITH BRIDGE DESIGN ASSOCIATES, INC. FOR <br />CR512 BRIDGE OVER FELLSMERE WATER CONTROL DISTRICT <br />(F. W. C D.) PARK LATERAL CANAL <br />ON MOTION by Commissioner Davis, SECONDED by <br />Commissioner Flescher, the Board unanimously approved <br />Work Order No. 21 (Engineering) with Bridge Design <br />Associates, Inc.; authorized the project as outlined in the <br />Scope of Services; and authorized the Chairman to <br />execute same, for a lump sum fee of $1,500, as requested <br />in the memorandum of August 2, 2010. <br />WORK ORDER ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />8.X. WORK ORDER No. 2-1 22 TO THE PROFESSIONAL BRIDGE DESIGN <br />SERVICES AGREEMENT WITH BRIDGE DESIGN ASSOCIATES, INC. FOR <br />CR512 BRIDGE OVER FELLSMERE WATER CONTROL DISTRICT <br />(F. W.C.D.) LATERAL "U" CANAL <br />ON MOTION by Commissioner Davis, SECONDED by <br />Commissioner Flescher, the Board unanimously approved <br />Work Order No. 22 (Engineering) with Bridge Design <br />Associates, Inc.; authorized the project as outlined in the <br />Scope of Services; and authorized the Chairman to <br />execute same, for a lump sum fee of $1,960, as requested <br />in the memorandum of August 2, 2010. <br />19 <br />August 17, 2010 <br />