Laserfiche WebLink
[gel I I 1 I wx all 11111 1 mcm <br />1 <br />CONSTRUCTION PROJECT REPRESENTATIVE KONTOULAS APPROACHED <br />THE BOARD AND DISCUSSED THE VARIOUS CHANGES IN CHANGE ORDER #11 <br />WHICH WERE: TO CONSTRUCT A 4" WATER METER BY—PASS; STORM WATER <br />RETENTION AREA, WHICH IS A LOW AREA IN THE NORTHEAST END OF THE PARKING <br />LOT; ACCESS APRON TO THE NORTH PARKING LOT; ENCLOSURE FOR DUMPSTERS; <br />AND RELOCATION OF A NEW TOWER FOR THE CHILLERS. MR. KONTOULAS <br />RECOMMENDED CHANGE ORDER #11 BE ACCEPTED. HE STATED THAT WITH THESE <br />CHANGES, THE COST OF THE JOB WILL BE $128,996.66 ABOVE THE CONTRACT <br />FIGURE. <br />ON MOTION BY COMMISSIONER LYONS, SECONDED BY COMMISSIONER <br />DEESON, THE BOARD UNANIMOUSLY APPROVED CHANGE ORDER #11 AND AUTHORIZED <br />THE SIGNATURE OF THE CHAIRMAN. <br />•' <br />