My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/5/1980 (2)
CBCC
>
Meetings
>
1980's
>
1980
>
11/5/1980 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:55 AM
Creation date
6/11/2015 12:41:48 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Fire Commissioners
Document Type
Minutes
Meeting Date
11/05/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 5198 ' <br />Booz 45 PAGE 198 <br />COMMISSIONER LYONS ASKED IF IT WOULD BE HELPFUL IF THE <br />BOARD WERE TO AUTHORIZE THE BILL FOR EXTRAORDINARY SERVICES AND <br />DEFINE IT SO THAT IT IS ON THE RECORD. <br />JOHN ROBBINS COMMENTED THAT UNDER THE ORIGINAL CONTRACT <br />THE PAYMENT FOR ENGINEERING SERVICES WAS ON A CONSTRUCTION FEE SCHED- <br />ULE BASIS, AND THEIR FEES WERE ESTABLISHED BY THE ORIGINAL BIDS. <br />ON THE REDESIGN, IT WOULD BE ON A SALARY PLUS FACTOR BASIS. <br />CHAIRMAN SIEBERT FELT THE BOARD COULD AUTHORIZE THE <br />ENGINEERS TO PREPARE SUCH A BILL AND APPROVE THE CONCEPT. <br />ON MOTION BY COMMISSIONER LYONS, SECONDED BY COMMISSIONER <br />LOY, THE THREE BOARD MEMBERS PRESENT UNANIMOUSLY AUTHORIZED THE <br />.JOINT VENTURE TO SUBMIT A BILL FOR DESIGN SERVICES IN CONNECTION <br />WITH THE REDESIGN OF THE GIFFORD SEWERAGE PLANT AS DISCUSSED. <br />REVISED PROPOSED PRIORITY SYSTEM FOR CONNECTION TO COUNTY WATER SYSTEM <br />UTILITY DIRECTOR LINER INFORMED THE BOARD THAT HE IS LOOKING <br />TO HAVE THE BOARD APPROVE THE PRIORITY SYSTEM FOR CONNECTION SO THAT <br />HE WILL BE ABLE TO DEAL WITH THE REQUESTS FOR WATER SERVICE IN THE <br />SOUTH COUNTY SYSTEM. HE CONTINUED THAT HE HAS HAD A MEETING.WITH THE <br />ADMINISTRATOR AND ONE OF THE COMMISSIONERS AND HAS TAKEN INTO CONSID- <br />ERATION COMMENTS MADE AT THE PREVIOUS MEETING. HE FELT THE PROBLEMS <br />HAVE BEEN RESOLVED AND THAT THEY NOW HAVE A WORKING SYSTEM SET UP. <br />ADMINISTRATOR NELSON STATED THAT HE FELT THIS PRIORITY <br />SYSTEM IS NECESSARY BECAUSE WE DO NOT HAVE UNLIMITED WATER SUPPLY, <br />AND THE UTILITY DEPARTMENT NEEDS SOME SORT OF A GUIDE TO TAKE APPLICA- <br />TIONS. <br />DISCUSSION THEN ENSUED ON THE CHANGES MADE FROM THE PREVIOUS <br />PROPOSAL, AND MR. LINER COMMENTED THAT THEY NOW HAVE :SET UP CATEGORIES <br />FOR "EXISTING" AND "PROPOSED." <br />ATTORNEY COLLINS COMMENTED THAT HE SAW NO REASON WHY THE <br />COUNTY COULD NOT ACCEPT APPLICATIONS AND GRANT THE RIGHT FOR SINGLE <br />FAMILY EXISTING HOMES, WHICH ARE OUR HIGHEST PRIORITY, TO CONNECT <br />IMMEDIATELY WITHOUT REQUIRING THEM TO WAIT THROUGH THE THREE-MONTH <br />ADVERTISING PERIOD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.