My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-149
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 3:41:28 PM
Creation date
10/5/2015 10:02:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/07/2014
Control Number
2014-149
Agenda Item Number
8I
Entity Name
Florida Department of Environmental Protection
Subject
Dune Repair (Hurricane Repair) Project
Florida Department of Environmental Protection Agreement No. 141R2
Supplemental fields
SmeadsoftID
13679
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverable F: One electronic submission of the RAI responses. <br />Total Cost: $7,967 ($3,983.50 — DEP funds). <br />Due Date: January 30, 2017. <br />Deliverable G: One electronic submission of the final construction plans and specifications. <br />Total Cost: $12,498 ($6,249 — DEP funds). <br />Due Date: January 30, 2017. <br />3.0 Construction <br />Work performed and costs associated with the placement of fill material and/or the construction of erosion control <br />structures within the project area. Eligible costs may include mobilization, demobilization, construction <br />observation or inspection services, beach fill, tilling and scarp removal, erosion control structures, dune <br />stabilization measures and native beach -dune vegetation. Construction shall be conducted in accordance with any <br />and all permits issued by the Department. <br />Performance Standard: Work products (Deliverables) must meet acceptance standards of the engineer, building <br />code inspector, Joint Coastal Permit, or a combination of these, as required, to assure all project -related <br />construction is completed to desired specifications. <br />3.1 Emergency Dune Nourishment- Orchid Beach <br />In coordination with Indian River County, the Town of Orchid Beach awarded a construction contract to the lowest <br />qualified bidder for emergency dune stabilization for the Orchid Beach section of the Sector 3 Project to address <br />damages sustained during Hurricane Sandy. Eligible costs include mobilization, demobilization, beach fill, permit <br />compliance, beach tilling, and native beach -dune vegetation. The Town and the County have an interlocal <br />agreement to provide reimbursement to the Town, who acted on behalf of the county during the emergency <br />situation. <br />Deliverable A: Copy of All Periodic Certified Pay invoices as submitted by Contractor and approved by The Town <br />of Orchid. <br />Total Cost: $270,393 ($135,196.50 — DEP funds). <br />Due Date: January 30, 20I7. <br />3.2 Emergency Dune Nourishment- Wabasso and Golden Sands <br />Indian River County awarded a construction contract to the lowest qualified bidder for Emergency dune <br />stabilization for the Wabasso and Golden Sand Project to repair damages sustained during Hurricane Sandy. <br />Eligible Costs include mobilization, demobilization, beach fill, permit compliance monitoring, nest relocation, <br />beach tilling, and native beach -dune vegetation. <br />Deliverable A: Copy of All Periodic Certified Pay Invoices as submitted by Contractor and approved by County <br />for the Wabasso repair. <br />Total Cost: $32,865 ($16,432.50 — DEP funds). <br />Due Date: January 30, 2017. <br />Deliverable B: Copy of All Periodic Certified Pay Invoices as submitted by Contractor and approved by County <br />for the Golden Sands repair. <br />Total Cost: $42,286 ($21,143 — DEP funds). <br />Due Date: January 30, 2017. <br />DEP Agreement No. 14IR2, Amendment No. 1, Attachment A-2, Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.