Laserfiche WebLink
I <br />1 '1 <br />November 18, 1980 <br />SVERDRUP & PARCEL AND ASSOCIATES, INC. <br />AND <br />BEINDORF AND ASSOCIATES, INC. <br />(A JOINT VENTURE) <br />MFMnPaNnIIM <br />Project No. <br />ROOK 45 PAGE 275 <br />TO: George Liner, Utilities Dept. <br />Indian River County <br />FROM: John A. Robbin�oz_ <br />SUBJECT: Status Report of Projects by Sverdrup & Parcel and Associates, Inc. <br />and Beindorf and Associates, Inc. (A Joint Venture) <br />ITEM rl - SOUTH COUNTY TAX DISTRICT <br />Engineer's Project No. 6858 <br />6674 <br />Status of the South County Water System is as follows: <br />--Production Well #1 is currently under construction and is estimated <br />to be completed the first week of December, 1980. Alsay-Pippin will <br />be mobilizing a second drill rig for construction of Production Well <br />#2 on or about November 19, 1980. This activity should insure comple- <br />tion of the test well program within the allotted time requirements for <br />that contract. Water quality information should be available during the <br />second week of December, 1980. <br />--The Transmission Distribution System final design is on schedule, and <br />we hope to advertise for bidding on or about the third week of December, <br />1980. <br />--The process specification is being completed and the availability of <br />water quality data from the test well program will determine the exact <br />bid date for the process equipment. We are hoping to advertise for bid <br />on or about the end of December, 1980. <br />kf PLY Tn <br />I X� 3885 207H STRI:.ET <br />,'U`, I- Of- f ICI Iii X 84V <br />VFRO BEACH, f LORIUA J291,0 <br />REPLY TO: <br />] 2002 N.W. 13TH STREET <br />SUITE 201 <br />GAINESVILLE, FLORIDA 32601 <br />