My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/19/1980
CBCC
>
Meetings
>
1980's
>
1980
>
11/19/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:55 AM
Creation date
6/11/2015 12:43:38 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/19/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wilsET-dWOR =1013 <br />UTILITY DIRECTOR LINER STATED THAT HE BELIEVED THERE HAS BEEN <br />A BREAKTHROUGH IN THE BOTTLENECK TYPING UP THE 201 PLAN. <br />CHAIRMAN LYONS EXPLAINED FOR THE BENEFIT OF THE NEW MEMBERS <br />THAT SEVERAL WEEKS AGO, IT BECAME EVIDENT THAT THE DER WAS GOING TO <br />CONTINUE TO CHANGE ITS REQUIREMENTS IN CONNECTION WITH THE TESTING <br />PROCEDURES WE HOPED TO EMPLOY IN PROVING OUT THE USE OF THE MOSQUITO <br />CONTROL IMPOUNDMENTS FOR THE EFFLUENT. WE PREVIOUSLY WERE GOING TO <br />USE THE VISTA ROYALE PROJECT FOR A TEST GROUND; THERE WAS A THREE- <br />MONTH TEST PERIOD; AND THE COST WAS MINIMAL. THE TEST REQUIREMENTS, <br />HOWEVER, BEGAN TO GROW AND GROW UNTIL IT WOULD TAKE A YEAR TO COMPLETE <br />THEM. CHAIRMAN LYONS REPORTED THAT WE TOOK THIS PROBLEM TO REPRE- <br />SENTATIVE DALE PATCHETT, WHO IS THE NATURAL RESOURCES SUB -COMMITTEE <br />CHAIRMAN FOR THE STATE HOUSE OF REPRESENTATIVES, AND HE ARRANGED <br />A MEETING WITH THE EXECUTIVE DIRECTOR OF THE DER AND ALL OF THE OTHER <br />PEOPLE WHO HAD HAD SOMETHING TO SAY IN THE DER IN CONNECTION WITH <br />THE 201 PLAN. THE CHAIRMAN STATED THAT HE, ATTORNEY COLLINS, FNGINEER <br />.JOHN ROBBINS, AND BRIAN BARNETT OF THE GAME & FRESH WATER FISH COM- <br />MISSION WENT TO THIS MEETING IN TALLAHASSEE, AT WHICH TIME IT WAS <br />PRETTY WELL DETERMINED THAT THEY WERE ASKING US FOR A LOT OF THING <br />WE PROBABLY DID NOT NEED, AND THEY AGREED TO GO BACK AND CHANGE A <br />LOT OF THE REQUIREMENTS. <br />UTILITY DIRECTOR LINER STATED THAT HE UNDERSTANDS FROM <br />ENGINEER JOHN ROBBINS THAT THE DER WILL ACCEPT OUR DESIGN, AND WE CAN <br />PROCEED WITH THE PROJECT AS IT HAS BEEN PRESENTED. <br />ENGINEER ROBBINS DISCUSSED THE STEPS WE STILL NEED TO <br />COMPLETE, NOTING THAT HE HAD BEEN TOLD ALL THAT WAS NEEDED WAS CERTIFI- <br />CATION OF THE 201 PUBLIC HEARING, BUT HE NOW HAS BEEN FURTHER INFORMED <br />THAT WE NEED TO SEND A TRANSCRIPT OF THAT HEARING AND COPIES OF <br />THE MUNICIPALITIES SUPPORTING RESOLUTIONS. MR. ROBBINS FELT IF <br />WE CAN GET THIS MATERIAL TO THE DER QUICKLY, WE WILL GET AN IMMEDIATE <br />RESPONSE ON STEP 1 APPROVAL, HE STATED THAT HE HAS A COPY OF THE <br />RESOLUTION WHICH THE COUNTY ADOPTED IN THIS REGARD AND RECOMMENDED <br />THAT THE BOARD CONTACT OR DESIGNATE HIM TO CONTACT THE MUNICIPALITIES <br />IN ORDER TO GET THEIR RESOLUTIONS QUICKLY. <br />NOV 191980 39 Bmx 45 FAc.E284 <br />
The URL can be used to link to this page
Your browser does not support the video tag.