Laserfiche WebLink
NOV 191980 <br />BOOK 45 PnE 287 <br />COMMISSIONER WODTKE ASKED IF HE IS TRYING TO SAY THAT THE <br />CONTRACTOR FEELS TO PUT THE PANELING UP WILL REQUIRE 20 DAYS TIME, <br />AND MR. KONTOULAS NOTED THAT THE CONTRACTOR IS SAYING THAT IT COULD, <br />BUT NOT THAT IT NECESSARILY WILL. <br />COMMISSIONER FLETCHER ASKED WHAT THE NET RESULT WOULD BE <br />IF THIS CHANGE ORDER WERE NOT APPROVED, AND MR. KONTOULAS STATED THAT <br />THE COURTROOMS WOULD BE A COMBINATION OF DRYWALL AND PANELING WHICH <br />WOULD BE VERY UNSIGHTLY. HE WENT ON TO EXPLAIN IN DETAIL THAT WHERE <br />THE WINDOWS WERE TAKEN OUT, THERE IS JUST DRYWALL INTERMITTENTLY <br />AMID PANELING. <br />COMMISSIONER BIRD WISHED TO KNOW THE NUMBER OF WINDOWS TAKEN <br />OUT WHICH LEFT VOIDS THAT MUST BE FILLED IN. MR. KONTOULAS STATED <br />THAT THERE WAS ONE WINDOW REMOVED IN EACH COURTROOM; SEVEN WINDOWS <br />ACTUALLY HAVE BEEN TAKEN OUT AND ONE BECOMES A DOOR OPENING. <br />COMMISSIONER BIRD THEN ASKED IF WE ARE TALKING ABOUT $13,000 <br />TO FILL THOSE INDENTATIONS, AND MR. KONTOULAS EXPLAINED THAT WAS THE <br />AMOUNT REQUIRED TO DO THE WHOLE ROOM; THE PANELING WILL BE LAMINATED <br />OVER THE DRYWALL. <br />COMMISSIONER WODTKE DISCUSSED THE ACTUAL COSTS OF MATERIAL <br />AND LABOR INVOLVED, PLUS 26% ALLOWED FOR OVERHEAD AND A POSSIBILITY OF <br />20 EXTRA DAYS, HE FELT THIS WORK MUST BE DONE, BUT NOTED THAT IT IS <br />A VERY EXPENSIVE ITEM AND AN EXPENSIVE MISTAKE FOR US TO HAVE TO <br />SWALLOW. <br />MR. KONTOULAS POINTED OUT THAT BEFORE COMPLETION WE ARE <br />GOING TO HAVE TO GET TOGETHER WITH THE ARCHITECT, DISCUSS THESE <br />MISTAKES, AND POSSIBLY GET SOME REBATE OR PERHAPS EVEN END UP IN <br />COURT. <br />ATTORNEY COLLINS COMMENTED ON THE ADDED PARAGRAPH ON THE <br />CHANGE ORDER ABOUT EXTRA TIME, WHICH HE FELT AMOUNTS TO ACQUIESCENCE <br />ON THE PART OF THE BOARD THAT WE MIGHT END UP WITH 20 DAYS ADDITIONAL, <br />AND WE, THEREFORE, WOULD BE HARD PRESSED TO DENY'THE 20 DAYS AT THE <br />END OF THE JOB. <br />42 <br />