My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-112 (2)
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 1:31:05 PM
Creation date
10/5/2015 8:57:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/04/2010
Control Number
2010-112
Agenda Item Number
12.J.2
Entity Name
Geosyntec Consultants
Subject
Solid Wate Disposal District
Work Order No. 26
Ground Water Assessment North County R.O. Plant
Supplemental fields
SmeadsoftID
8348
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo syn to e � 6770 South Washington Avenue, Suite 3 <br />Titusville, Florida 32780 <br />PH 321.269.5880 <br />C011SUlta n (S FAX 321.2695813 <br />,mw.geosy nleacoin <br />ATTACHMENT A <br />24 March 2010 <br />Mr. Terry Southard <br />Operations Manager <br />Indian River County Utilities <br />4350 4151 Street <br />-Vero Beach, FL 32967 <br />Subject: Natural Attenuation Monitoring Reporting Proposal <br />North County R.O. Plant, Facility #9600729 <br />Vero Beach, FL 32962 <br />Dear Mr. Southard, <br />Geosyntec Consultants (Geosyntec) is pleased to submit this fee proposal to Indian River County <br />(IRC) for professional services required to provide reporting documentation to respond to <br />Florida Department of Environmental Protection's (FDEP's) correspondence dated 21 December <br />2009. The FDEP correspondence was generated based upon a review of Geosyntec's 21 <br />September 2009 report, Site Assessment Report, North RO Plant, Facility #9600729. Based <br />upon a review of the Site Assessment Report (SAR), FDEP approved the Natural Attenuation <br />(NAM) Plan proposed in the September 2009 SAR for the above reference Site with the <br />following specific conditions: <br />• The NAM Plan shall include wells MW01, MW02, MW03, MW05, MW06, PZ10, PZ19, <br />PZ20, and PZ22. <br />• Groundwater monitoring shall be completed on a quarterly basis with quarters being <br />January through March, April through June, July through September and October <br />through December. <br />• If sodium concentrations increase above the current concentration of 213 milligrams per <br />liter reported in the groundwater samples from well MW06 then the Department shall <br />require additional assessment activities near well MW06 as needed to define the extent of <br />horizontal contamination. <br />XR10051/XR10051 IRC North RO NAM Reporting Proposal.Doc <br />engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.