Laserfiche WebLink
r DEC 31980 <br />During the workshop session, the proposed <br />concepts were outlined and based upon the <br />design will proceed in accordance with the <br />Outline Specifications. <br />Boa 45 PAGA48 <br />roadway alignment and drainage <br />resulting discussions, final <br />attached Design Development <br />E.S.&E. will again touch base with the agencies involved in order to <br />receive comments concerning the proposed drainage box culverts and <br />roadway crossdrains and any subsequent problems that may effect the permit <br />application process. <br />As part of the permit application, exhibits showing each of the proposed <br />box culverts, roadway crossdrains and bridge, along with design data, must <br />be submitted. For this reason, a timely resolution of the legal concern <br />of tidal flushing to the East impounded areas due to the two proposed <br />crossdrains (Station 374 + DO and 386 + 30)is ir,rperative. <br />Enclosed you will find a print of the Drainage flap with the proposed <br />drainage as outlined in the Design Development Outline Specifications. <br />I trust that this will aid in your percepticn of the Project at this <br />point in time. <br />If we may be of any additional assistance, please give John Deamud or <br />myself a call. <br />Sincerely, <br />REYNOLDS, SMITH AND HILLS <br />Stephen L. Kincaid, P.E. <br />Design Engineer <br />DESIGN DEVELOPMENT <br />OUTLINE SPECIFICATIO14S <br />INDIAN RIVER BOULEVARD EXTENSION <br />SITEWORK: Clear and grub to prepare the site for placement of the <br />bridge and paved roadway. Strip area within limits of <br />construction of all vegetation and trees and soils contain- <br />ing roots to approximately six inches or more where requ i rf J. <br />De -muck areas as required in accordance with the recocrurend,;- <br />tions of the "Soils" Engineering Report. Compact arca and <br />place necessary fill, compacting in layers, in the desitv,! <br />elevations and achieve the specified density. <br />DRAINAGE: Provide a bridge over the stain Canal consisting of a 1-i- <br />foot span with a minimum 14 feet clearance ,above M.H.U. <br />elevation of 2.215 feet. Provide a double 10' x 5' box <br />culvert in the North Canal and a double 9' x 4' box cuivt't-t <br />in the canal adjacent to Barber Avenue crossirly under <br />Indian River Boulevard. In addition to the Bridge and L,C.\ <br />culverts provide additional crossdrainage under the roadt.,.Y <br />at Stations 365 4 00 (±), 375 + 00 (1) and 336 + 35 (f� <br />The structures provide adequate conveyance area in the <br />waterways for existing and future flow conditions to <br />prevent flooding during design storm events. In additio,", <br />tidal flushing is improved considerably to areas currentiv <br />receiving little or no tidal flushing. Roadway pavement <br />run-off will' b4� directed to the East and pi cl:ed up by <br />parallel Swale ditches within the roadway right-of-wav and <br />directed to nearest existing waterway. <br />PAVING: The roadway shall be twenty-four (24) feet of pavement .:it.', <br />a ten (10) feet stabilized shoulder each side. Side slore•, <br />shall typically be 6:1 with variances as required to min kii:: <br />right of way requirements. All paved areas shall be aspha:: <br />concrete. Finished pavement shall be striped and required <br />safety appurtenances will be provided in accordance with <br />current County and State design criteria. <br />RE71W 11/12/80 <br />