My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/5/1980
CBCC
>
Meetings
>
1980's
>
1980
>
12/5/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:56 AM
Creation date
6/11/2015 12:46:23 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
12/05/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 51980 BooK 45 FA' <br />U407 <br />MR. KONTOULAS FAVORED ACCEPTING THE EXTENSION OF THE <br />CONTRACT RATHER THAN ACCEPTING THE CREDIT AND THEN HAVING TO RENEGO- <br />TIATE AT A LATER DATE. <br />CHAIRMAN LYONS COMMENTED THAT THE EXTENSION OF TIME WOULD <br />GIVE THE PEOPLE IN THE ANNEX 18 DAYS TO MOVE OUT, AND MR. KONTOULAS <br />AGREED, NOTING THAT THE PROPERTY APPRAISER AND THE TAX COLLECTOR <br />CANNOT MOVE OUT UNTIL THE ADMINISTRATION BUILDING IS COMPLETED; S0, <br />THIS IS ALL BASED ON THE COMPLETION DATE OF THAT BUILDING. <br />CHAIRMAN LYONS REQUESTED THAT MR. KONTOULAS EXPLAIN ABOUT <br />THE CREDIT AND HOW WE WOULD DEAL WITH THE FACT THAT THE WAY THE <br />CONTRACT WAS BID CALLS FOR SOME OF THE LIGHTS IN THE ANNEX TO BE <br />USED TO COMPLETE THE COURTHOUSE, EVEN THOUGH THESE LIGHTS ARE PRES- <br />ENTLY BEING USED IN THE ANNEX. <br />MR. KONTOULAS EXPLAINED THAT WHAT THE CONTRACTOR HAS DONE <br />IN THE CREDIT IS LIST HIS SUB -CONTRACTING COST; HE INFORMED THE BOARD <br />THAT THE CONTRACTOR ALREADY HAS BOUGHT THE CARPETING AND ALUMINUM <br />STOREFRONT, WHICH IS FOR THE DOOR ON THE SECOND FLOOR OF THE ANNEX <br />LEADING TO THE NEW CAUSEWAY. IN REGARD TO THE LIGHTS, MR. KONTOULAS <br />CONTINUED THAT APPROXIMATELY 46 LIGHTING FIXTURES FROM THE ANNEX <br />ARE TO BE REHUNG AND REUSED IN PORTIONS OF THE COURTHOUSE. HE NOTED <br />THAT THESE LIGHTS ARE ARRANGED IN ROWS, AND THEY WOULD TAKE SOME <br />OUT OF EACH ROW SO THAT IT WOULD BE ONLY A LITTLE DARKER. <br />ADMINISTRATOR NELSON COMMENTED THAT THEY HAVE DONE EVERY- <br />THING POSSIBLE NOT TO INTERRUPT THE PEOPLE OVER IN THE ANNEX. HE <br />STATED THAT THE CLERK'S PEOPLE HAVE COOPERATED MAGNIFICENTLY DURING <br />THE ON-GOING RENOVATIONS IN THE COURTHOUSE, AND WE NOW WILL NEED <br />SOME COOPERATION FROM THE PEOPLE IN THE ANNEX. <br />ON MOTION BY COMMISSIONER FLETCHER, SECONDED BY COMMIS- <br />SIONER BIRD, THE BOARD UNANIMOUSLY AUTHORIZED THE CONSTRUCTION PROJECT <br />REPRESENTATIVE TO REQUEST THE CONTRACTOR TO WRITE A CHANGE ORDER <br />APPROVING CHANGE PROPOSAL #1 (9364-1) AND DELETING CHANGE PROPOSAL <br />#12 RE THE COURTHOUSE AND AUTHORIZED THE SIGNATURE OF THE CHAIRMAN. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.