My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/31/1980
CBCC
>
Meetings
>
1980's
>
1980
>
12/31/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:56 AM
Creation date
6/11/2015 12:48:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/31/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D E C 311990-Brrr>x '45 'PAc <br />- MR. KONTOULAS CONTINUED THAT THE PARAGRAPH RELATING TO A <br />$300 PER DAY CHARGE FOR FIXED OVERHEAD COSTS WAS APPROVED FOR <br />CHANGE ORDER #I2 (COUNTY ADMINISTRATION BUILDING) AS FOLLOWS, AND <br />THE $400 FIGURE DID NOT APPEAR UNTIL NOVEMBER OF THIS YEAR: <br />The proposed.changes in the work may result in additional time required <br />beyond the contract completion date. Additional time will be added to <br />the contract that is directly related to this change order. The con- <br />tractor will be paid for the additional required days at the rate of <br />$300.00 (three hundred) per day for fixed overhead costs. The number <br />of days requested are reflected in CP -27, CP -30, CP -32 and CP 34. <br />MR. KONTOULAS INFORMED THE BOARD THAT HE HAD CONFERRED WITH MR. KIRSCH <br />OF CONNELL, METCALF & EDDY AND HE CONFIRMED THAT WE HAD AGREED TO THE <br />$300 PER DAY, BUT STATED THAT WE DID NOT APPROVE THE $400 PER DAY'. <br />CONSIDERABLE DISCUSSION ENSUED, AND IT WAS GENERALLY FELT <br />THAT THE BOARD SHOULD TAKE THE POSITION THAT $300 A DAY IS THE CORRECT <br />CHARGE AND LET THE CONTRACTOR PROVE OTHERWISE. <br />ON MOTION BY COMMISSIONER BIRD, SECONDED BY COMMISSIONER <br />SCURLOCK, THE BOARD UNANIMOUSLY AUTHORIZED THE ADMINISTRATOR OR <br />CONSTRUCTION PROJECT REPRESENTATIVE TO WRITE THE CONTRACTOR STATING <br />THAT THE COUNTY'S POSITION IS THAT THE OVERAGE DAYS WILL BE AT $300 <br />PER DAY UNLESS THE CONTRACTOR CAN SHOW JUSTIFICATION OTHERWISE. <br />:MR. KONTOULAS REPORTED THAT THE CONTRACTOR IS TRYING TO GET <br />COMPLETED' IN THE COURTHOUSE BY THE FEBRUARY DEADLINE, AND HE BELIEVED <br />THEY WILL BE QUITE CLOSE, POSSIBLY FEBRUARY LOTH OR 15TH. HE DID NOT <br />EXPECT ANY MORE CHANGE ORDERS OR PROPOSALS ON THE COURTHOUSE. <br />COMMISSIONER FLETCHER EXPRESSED HIS APPRECIATION OF THE <br />WORK MR. KONTOULAS HAS BEEN DOING. <br />'P_RELIMINARY PLAT APPROVAL - SYLVAN ESTATES <br />THE TECHNICAL REVIEW COMMITTEE MADE THE FOLLOWING RECOM- <br />MENDATIONS IN REGARD TO SYLVAN ESTATES: <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.