My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/28/1981
CBCC
>
Meetings
>
1980's
>
1981
>
1/28/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:51:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/28/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />45 'PACE?'. 4 <br />THE BOARD REVIEWED THE FOLLOWING MEMO FROM ADMINISTRATOR <br />NELSON: <br />BOARD OF COUNTY COMAJISSIONERS <br />2145 14th Avenue, Vero Beach, Florida 32960 <br />NEIL A. NELSON - County Administrator <br />Lawyers Title Building <br />2345 14th Avenue, Vero Beach, Florida 329GO <br />Telephone: (305) 562-4186 <br />MEMORANDUM <br />Secretary to Beard <br />Telephone: (305) 569-1940 <br />January 21, 1931 <br />TO: Board of County Commissioners <br />FROM: County Administrator <br />SUBJECT: Indian River Boulevard Extension Re -Design <br />of South Bound Pavement Royal Palm Blvd. <br />North to the Main Canal <br />Encl: Reynolds, Smith & Hills Letter Dated 1-6-81, <br />Same Subject <br />Reynolds, Smith & Hills planned to use the previous <br />Architect's design of Indian River Boulevard Extension <br />from Royal Palm Boulevard north to the canal. In their <br />detail study of Greiner's design, it was discovered that <br />the ditch that drains Royal Palm Boulevard area was to be <br />relocated to the west. This relocation of the ditch was <br />to provide enough area to construct a turning lane. <br />The workshop group that met December 12th to discuss <br />the re -design, felt that the relocation would cause many <br />problems and delays. At that time, RS&H were requested <br />to re -design the south bound pavement area to provide for <br />traffic movement and eliminate the ditch relocation. <br />- This re -design will cost approximately $1200.00. <br />However, the construction costs saved in not relocating <br />the ditch justifies the re -design cost. It is therefore <br />recommended that the County Administrator be authorized <br />to confirm in writing that the County -is desirous.of this <br />re -design and is authorizing the additional cost of <br />approximately $1200.00. <br />• .a <br />Neell A Nelson, Coui ty <br />n.istrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.