My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/25/1981
CBCC
>
Meetings
>
1980's
>
1981
>
2/25/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:53:12 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/25/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: Indian River County <br />(name, address) County Courthouse <br />CHANGE ORDER NUMBER: .10 (Ten) <br />TO (Contractor) <br />�einhold Construction, Inc. ARCHITECT'S PROJECT NO: 9364 <br />p. 0. Box 666 CONTRACT FOR.Addi t ions and Renovations <br />Cocoa, FL. 32922 <br />L CONTRACT DATE: 4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -28 Provide new grounds P new telephone backboards in Rms. 205 24.2 <br />and 243 and In the Basement of the Courthouse Bldg. $7 7 <br />Grounds shall be run as per attached CP -28 for location and <br />materials <br />The proposed changes in the work may result in additional time required <br />beyomd the contract complition date. Additional timd will be added to <br />the contract that is directly related to this change order. The contractor <br />will be paid for the additional required days at the rate of $300.00 <br />(three hundred) per day for fixed overhead costs. The number of days <br />requested are reflected in CP -28. <br />I <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . S 689,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . .S 127,508.47 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ 186,508.47 <br />The Contract Sum will be (increased) (dRr Wa,0+ by this Change Order . . . S 724.27 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . S 817,232.74 <br />The Contract Time will be 60"za"J) (douaaJ" (unchanged) by ® ( •� ) Divs. <br />The Date of Completion as of the date of this Change Order therefore is <br />Connell metcal Eddy Reinhold Construction, Inc. Indian River County <br />AR HITECT CONT-PACTCOR Ow 'ER <br />-__1320 a P_o�B�x66f: -7-1_L4th_Ave- <br />Address Address Addres <br />Coral Gables, F1 33134 Cocoa, FL. 32922 V each, F <br />BY --- --- <br />DATE 2 Q��f _DATE D^TSE C;roZ4� <br />AIA DOCUMIN't W01 - CHA%Gr ORDER - APRIL 1970 EDITION • AIMS • d 1970 - THE <br />AMERICAN t%,siiiuu or ARCH1110S. 1731 N1W YORK AVE.. N%V. WASHING10N. D.C. 20006 <br />44 <br />,.ONE PACE <br />�K , 45 PAGE '88.4 <br />CHANGE <br />ARCti11ECT <br />�] <br />ORDER <br />Fo o RACtoR <br />CU <br />U <br />AIA DOCUM[N1 G701 <br />OTttFR <br />PROJECT: Indian River County <br />(name, address) County Courthouse <br />CHANGE ORDER NUMBER: .10 (Ten) <br />TO (Contractor) <br />�einhold Construction, Inc. ARCHITECT'S PROJECT NO: 9364 <br />p. 0. Box 666 CONTRACT FOR.Addi t ions and Renovations <br />Cocoa, FL. 32922 <br />L CONTRACT DATE: 4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -28 Provide new grounds P new telephone backboards in Rms. 205 24.2 <br />and 243 and In the Basement of the Courthouse Bldg. $7 7 <br />Grounds shall be run as per attached CP -28 for location and <br />materials <br />The proposed changes in the work may result in additional time required <br />beyomd the contract complition date. Additional timd will be added to <br />the contract that is directly related to this change order. The contractor <br />will be paid for the additional required days at the rate of $300.00 <br />(three hundred) per day for fixed overhead costs. The number of days <br />requested are reflected in CP -28. <br />I <br />The original Contract Sum was . . . . . . . . . . . . . . . . . . . . . S 689,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . .S 127,508.47 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . . $ 186,508.47 <br />The Contract Sum will be (increased) (dRr Wa,0+ by this Change Order . . . S 724.27 <br />The new Contract Sum including this Change Order will be . . . . . . . . . . . S 817,232.74 <br />The Contract Time will be 60"za"J) (douaaJ" (unchanged) by ® ( •� ) Divs. <br />The Date of Completion as of the date of this Change Order therefore is <br />Connell metcal Eddy Reinhold Construction, Inc. Indian River County <br />AR HITECT CONT-PACTCOR Ow 'ER <br />-__1320 a P_o�B�x66f: -7-1_L4th_Ave- <br />Address Address Addres <br />Coral Gables, F1 33134 Cocoa, FL. 32922 V each, F <br />BY --- --- <br />DATE 2 Q��f _DATE D^TSE C;roZ4� <br />AIA DOCUMIN't W01 - CHA%Gr ORDER - APRIL 1970 EDITION • AIMS • d 1970 - THE <br />AMERICAN t%,siiiuu or ARCH1110S. 1731 N1W YORK AVE.. N%V. WASHING10N. D.C. 20006 <br />44 <br />,.ONE PACE <br />�K , 45 PAGE '88.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.