My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/11/1981
CBCC
>
Meetings
>
1980's
>
1981
>
3/11/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:56:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/11/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br />OWNER <br />CHANGE ARCHITECT ❑ <br />ORDER CONTRACTOR (] <br />FIELD ❑ <br />AIA DOCUMENT G701 OTHER <br />PROJECT: Indian River County <br />(name. address)AdministratIon Bldg. <br />TO (Contractor) <br />f—Reinhold Construction Inc. <br />P.O, Box 666 <br />Cocoa, F1. 32922 <br />CiiANGE ORDER NUMBER:17 (seventeen) <br />ARCHITECT'S PROJECT NO: <br />CONTRACT FOR. Additions <br />J CONTRACT DATE: <br />You are directed to make the following changes in this Contract: <br />Cp- 43 (Rev. 1/19/81) <br />1- provide additional dupl <br />rex receptacles, telephonAtsooutlets <br />introtams <br />telepower" poles in Rooms W-189,1909 and 191. <br />W-162,185,186,192, and 193. <br />9363 <br />& Renovatoons <br />$5,181.92 <br />The proposed changes in the work may result in additional time required <br />beyond the contract complitiotn date. Additional time will beadded <br />dedcontoactor <br />the contract that is directly related to this change order. T <br />will be paid for the additional required days at the rate of $300.00 <br />(three hundred) per day for fixed overhoad costs. The number of days are <br />reflected in CP- 43. <br />Owner request - see attached Change Proposal <br />S 2,748,000.00 <br />The original Contract Sum was . . . . . . . . • • • . • $ 207,398.18 <br />Net change by previous Change Orders . . . . . . • • • • . • • • . $ 2,955,398.18 <br />The Contract Sum prior to this Change Order was . . . . . • . • • • • • ' ' 5,181.92 <br />The Contract Sum will be (increased) (decreased) (unchanged) by this Change Order . • . $ <br />2,960,580.10 <br />The new Contract Sum including this Change Order will be . • • • • • • • ' ' ( )Days. <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />The Date of Completion as of the date of this Change Order therefore is <br />Connell Metcalf l; EdJy Reinhold Construction Inc. <br />ARCHIT ECTJ-3 X 1 iie iWB�— CONTRACTOR <br />U. "a es El r-33134 cocoa , F --3232-2 <br />Address Address <br />BY / /" r BY <br />DATE 312 2 ! ,F1 DATE <br />Indian River County <br />OWNER 445 -44th -Ave <br />Vero Beach,f 23 960 <br />Address <br />BY <br />DATE <br />AIA DOCUMENT G741 • CHANGE ORDER • APRIL 1970 EDITION • AIAS • O 1970 • THE O%E PAGE <br />AMERICAN INSTITUTE Of ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 <br />47 <br />Bou 46 PAGE 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.