Laserfiche WebLink
FINAL COST FOR: <br />9TH COURT SW BETWEEN OSLO ROAD & 11TH STREET SW <br />DATE: January 26, 1999 <br />PROJECT NO. 9328 <br />TOTAL F.F. <br />TOTAL L.F. <br />2,498.07 <br />1,332.00 <br />FINAL COST <br />CONSTRUCTION <br />Labor S21,009.43 <br />Equipment S15,945.14 <br />Asphalt 57,306.15 <br />Outside Labor 52,067.75 <br />Sod 52,621.40 <br />Pipe 52,568.63 <br />Catch Basins S466.00 <br />Limcrock 57.743 39 <br />Total Construction Costs: 559,727.89 S59,727.89 <br />PERMIT FEES 5350.00 5350.00 <br />ROW ACQUISITION & N/A N/A <br />TITLE S1 ARCU FEES <br />ENGINEERING <br />(Based on S2.59/L.F.) 52.59 X 1.332.001_F. = 3,449.88 <br />Sub -Total 563,527.77 <br />Administration 2.9997% 51,905.59 <br />Recording Fees 520000 <br />TOTAL 565,633.36 <br />25% County's Cost 516.408.34 <br />75% Property Owner's Assessncnt 549,225.02 <br />2% Tax Collector s Foe (75% Figure) 5984 50 <br />TOTAL ASSESSMENT----��5 <br />Assessment <br />559.20 32 = SO 14873 <br />337,588.35 I <br />J <br />9328CST3.,WK4 01/28/99 <br />