My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
3/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:58:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
03/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION BY COMMISSIONER WODTKE, SECONDED BY COMMISSIONER <br />SCURLOCK, THE BOARD UNANIMOUSLY APPROVED THE RECOMMENDATIONS RE <br />ELECTRICAL SERVICE TO BLUE CYPRESS .LAKE PARK SET. OUT IN THE ADMINIS— <br />TRATOR�S MEMO OF MARCH 5, 1981, AS FOLLOWS: <br />TO: The Honorable Board of DATE: March 5, 1981 FILE: <br />County Commissioners <br />SUBJECT: Blue Cypress Lake Park <br />Electrical Service Installation <br />FROM: Rei, At Nelson' REFERENCES: <br />County Administrator <br />Description & Conditions <br />At the present time there is no electrical service available at the <br />above site to energize the 3/4 horsepower pump purchased to supply <br />water to the existing restroom facility at this park: The Health <br />Department has put the County on notice that water being supplied to <br />the sanitary facilities from an artesian well has inadequate pressure. <br />'Furthermore, future needs of the park will require electrical <br />service. <br />Alternatives and Analysis <br />Based on the above, it is the staff's opinion that a 450 amp, 110 volt <br />service is recommended at the above site to meet existing need and <br />future planning needs for providing additional camping facilities. <br />Peace River Electric Co. which serves this area, states that the County <br />must install a service pole, electrical panel, breaker, weatherhead <br />and meter box so the service can be supplied. Informal quotations <br />from Indian River Electric Co. estimate the cost of providing the <br />above at approximately $1,100. The alternatives are to: <br />1) Provide electrical service for supplying water to the <br />existing sanitary facilities and reserve capability <br />for future needs at an estimated cost of $1,100. <br />2) -Provide electrical service with capacity to only meet <br />the needs of the existing sanitary facilities with no <br />reserve capacity at an estimated cost of $900. <br />3) Provide no service and cease operation of the park <br />sanitary facilities. <br />60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.