My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
3/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:58:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
03/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIREWALLS <br />FW <br />52 <br />(Same as 50 & 53) <br />FW <br />53 <br />Provide new stud & fireboard "X" both sides as <br />indicated on plans to underside of structure <br />FW <br />54 <br />(Same as 53) <br />FW <br />55 <br />Extend existing CMU wall with stud & fireboard <br />"X" both sides to underside of structure and <br />extend existing lath &•plaster wall with stud <br />& fireboard "X" both sides to underside of <br />structure <br />FW <br />56 <br />(Same as 53) <br />i <br />FW <br />57 <br />(Same as 50) <br />FW <br />58 <br />(Same as 50) <br />(Same as 53) <br />FW <br />59 <br />(Same as 50) <br />FW <br />60 <br />(Same as 53) <br />FW <br />61 <br />(Same as 50) <br />FW <br />60A <br />Extend existing stud & plaster wall with stud <br />& fireboard "X" both sides to underside of• <br />structure <br />FW <br />61A <br />(Same as 60A) <br />FW <br />62 <br />(Same as 53) <br />FW <br />62A <br />,Patch masonry <br />FW <br />63 <br />(Same as 53) <br />FW <br />64 <br />(Same as 53) _ <br />FW <br />65 <br />(Same as 50) <br />FW <br />56A <br />Patch masonry <br />y <br />FW <br />57A <br />Patch masonry <br />t <br />FW <br />58A <br />I <br />(Same as 60A) <br />FW <br />64A.- <br />Extend existing stud & plaster wall with stud <br />& fireboard "X" both sides to underside of <br />structure. Patch masonry. Provide new stud <br />:. <br />& fireboard "X" both sides as indicated on plans <br />to underside of structure. <br />I <br />r A x <br />ry <br />�QOKt PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.