Laserfiche WebLink
��.- `�r� �^t*w�cs+,^ __ <br />"'.�, gam-..• .t. :�:.-�- <br />.�: ?a' "c--`�'�,� r 'a" �'rx <br />MAR 181981© <br />l <br />MOTION WAS MADE BY COMMISSIONER SCURLOCK TO AUTHORIZE THE <br />CHAIRMAN TO SIGN THE RECOMMENDED LETTER WHICH WOULD CONSTITUTE <br />AUTHORITY FOR CONNELL, METCALF & EDDY TO ISSUE A WORK ORDER FOR <br />REINHOLD CONSTRUCTION, INC., TO PERFORM THE WORK IN COMPLETE REPAIR, <br />REPLACEMENT AND/OR INSTALLATION OF THE FIREWALLS AS SHOWN ON THE <br />DRAWINGS AND DETAILED IN THE FIREWALL LIST FOR THE COUNTY ADMINISTRATION <br />BUILDING; REQUEST THE CONTRACTOR TO SUBMIT A FORMAL PROPOSAL- FOR THIS <br />WORK PRIORsTO COMMENCEMENT; AND REQUIRE THAT THE ARCHITECT SUPPLY <br />ANY ADDITIONAL INFORMATION NEEDED. MOTION WAS SECONDED BY COMMISSIONER <br />WODTKE FOR PURPOSES OF DISCUSSION. <br />COMMISSIONER WODTKE WISHED TO KNOW, IF ADDITIONAL INFORMA— <br />TION IS GOING TO BE NEEDED, WHY IT WAS NOT PREPARED BEFORE TONIGHT, <br />AND MR. GRAZIANI EXPLAINED THAT, BY ADDITIONAL INFORMATION, HE MEANT <br />ONLY ANY SPECIFIC ANSWERS TO ANY PARTICULAR QUESTIONS THE CONTRACTOR <br />MIGHT HAVE ABOUT REPAIRING A PARTICULAR FIREWALL. <br />THE BOARD WISHED FURTHER ASSURANCE THAT THE CONTRACTORS <br />ARE BEING INSTRUCTED TO BUILD SO THAT WE CAN OBTAIN A CERTIFICATE OF <br />OCCUPANCY AND WHETHER WE HAVE ANY REASON TO EXPECT THAT THE COMPLETED <br />WALLS WILL NOT MEET THE REQUIREMENT OF THE CITY OF VERO BEACH FOR A <br />CERTIFICATE OF OCCUPANCY, <br />MR. GRAZIANI STATED THAT THEY HAVE TO, AND.COMMISSIONER BIRD <br />ASKED IF THE ARCHITECT WILL CERTIFY THAT THESE ARE ONE—HOUR FIREWALLS. <br />MR. GRAZIANI EXPLAINED THAT THE ARCHITECT DOES NOT CERTIFY <br />THIS; IT IS THE FIRE MARSHALL WHO APPROVES THEM HE REPORTED THAT <br />THEY HAD MET WITH THE FIRE MARSHALL AND BUILDING INSPECTOR TO DISCUSS <br />THESE WALLS AND WALK THE BUILDING,AND THE INSTRUCTIONS FOR DOING THE <br />FIREWALLS AS SET OUT ARE ACCEPTABLE TO THEM. MR. KONTOULAS NOTED <br />THE ARCHITECT WILL HAVE TO CERTIFY IN WRITING TO THE BUILDING DEPART— <br />MENT THAT THE BUILDING MEETS CODE. <br />COMMISSIONER BIRD NOTED THAT THE CONTRACTOR IS SAYING HE <br />DOES NOT HAVE ENOUGH INFORMATION, AND MR. GRAZIANI STATED THAT THEY <br />ARE WILLING TO CLARIFY ANY QUESTION. <br />