My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/16/1981
CBCC
>
Meetings
>
1980's
>
1981
>
3/16/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:58:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
03/16/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAIRMAN LYONS STATED THAT HE UNDERSTOOD MR. REINHOLD'S <br />CONCERN AND THAT HE HAS ASKED US TO DO A SPECIFIC THING; OUR LAWYER <br />HAS INDICATED HE IS WILLING TO DO A SPECIFIC THING; WE UNDERSTAND <br />WHAT THE CONTRACTOR IS REQUESTING AND WILL TRY TO HELP. <br />MR, REINHOLD THEN WENT ON TO DISCUSS FIREWALLS, NOTING THAT <br />AT THE EVENING MEETING OF MARCH 18TH, IT WAS HIS UNDERSTANDING THAT <br />A LETTER WAS SENT TO THE COUNTY'S CONSULTANT REGARDING CERTAIN FIREWALL <br />CONSTRUCTION. HE INFORMED THE BOARD THAT AS OF THIS DATE, THE CONTRACTOR <br />HAS RECEIVED NO INSTRUCTIONS FROM THE COUNTY'S CONSULTANT, EITHER VER- <br />BALLY OR IN WRITTEN FORM. <br />MR. REINHOLD CONTINUED THAT HIS UNDERSTANDING WAS THAT THE <br />CONTRACTOR WOULD BE REQUESTED TO PREPARE AN ESTIMATE FOR THE WORK <br />THAT WAS TO BE ACCOMPLISHED. HE THEN REVIEWED THE WORK THE CONTRACTOR <br />ALREADY HAS DONE IN RESPECT TO PREPARING SUCH AN ESTIMATE,_NOTING <br />THAT IN NOVEMBER OF 1980, THEY ACCOMPLISHED WHAT WAS INDIdATED ON <br />THE ORIGINAL CONTRACT DOCUMENTS AS ALL THE FIREWALL WORK. THEY CALLED <br />THE LOCAL AUTHORITIES AND ASKED THEM TO REVIEW THAT WORK BEFORE THEY <br />COVERED IT UP, AND IT WAS AT THIS JUNCTURE THAT ADDITIONAL WORK WAS <br />DISCOVERED. ON NOVEMBER 101 19801 REINHOLD CONSTRUCTION RECEIVED <br />THE FIRST WRITTEN REQUEST FOR A CHANGE PROPOSAL RE FIREWALLS, ACCOM- <br />PANIED WITH A SET OF DOCUMENTS REQUESTING THE CONTRACTOR TO PROVIDE ONE- <br />HOUR FIRE RATED WALLS WHERE NECESSARY TO COMPLETE THE FIRE ZONES AS <br />SHOWN ON THE ATTACHED DRAWINGS. <br />MR. REINHOLD THEN READ ALOUD THE CONTRACTOR'S RESPONSE TO <br />CHANGE PROPOSAL N0. 37, DATED JANUARY 131 19811 AS FOLLOWS: <br />45 <br />s <br />R��.A 150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.