My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-183
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 3:54:22 PM
Creation date
10/5/2015 8:53:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/10/2008
Control Number
2008-183
Agenda Item Number
8.B.
Entity Name
Applied Technology and Management
Subject
Work Orcer No.11 Beach Preservation Plan
Area
Beach Sectors 1 and 2
Supplemental fields
SmeadsoftID
7436
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shoreline and volume changes and the post -project condition of the borrow site. ATM will provide <br />the FDEP with aerial photography (rectified and geo-referenced under a separate work order). <br />ATM will prepare the 1 -Year Post -Construction Physical Monitoring Report as necessary. The <br />County will provide ATM with comments to a draft version, and ATM will distribute the report as <br />necessary. <br />ATM will provide the County with one draft report for review, and distribute final copies to the <br />County and regulatory agencies. <br />Task 7 Sea Turtle Nest Monitoring (Initial Post -Construction Nesting Season) <br />Ecological Associates Inc. (EAI) will provide sea turtle nesting surveys per Florida Fish and <br />Wildlife Conservation Commission (FWC) and DEP-permit requirements. ATM will provide the <br />County will all reports provided by EAI. ATM will coordinate efforts and review EAI -provided data <br />prior to distribution. <br />Task 8 Agency Coordination and Project Administration <br />Under this task, ATM will coordinate with federal and state regulatory agencies on key project <br />issues and overall satisfaction of permit -required submittals. Quality control and quality <br />assurance will ensure that all submittals and agency coordination meet ATM's and the County's <br />standards for reporting. All documents will be peer-reviewed intemally by ATM staff, and provided <br />to the County for comment. <br />Future Tasks <br />The issued FDEP and USACE permits require monitoring of the project for a minimum of two <br />additional years for physical monitoring and three additional years for biological monitoring. It is <br />assumed that the monitoring requirements will not change, and estimated fees are based on the <br />relevant tasks of this Scope of Work with a 5% increase to account for estimated increases for <br />labor and equipment rates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.