Laserfiche WebLink
shoreline and volume changes and the post -project condition of the borrow site. ATM will provide <br />the FDEP with aerial photography (rectified and geo-referenced under a separate work order). <br />ATM will prepare the 1 -Year Post -Construction Physical Monitoring Report as necessary. The <br />County will provide ATM with comments to a draft version, and ATM will distribute the report as <br />necessary. <br />ATM will provide the County with one draft report for review, and distribute final copies to the <br />County and regulatory agencies. <br />Task 7 Sea Turtle Nest Monitoring (Initial Post -Construction Nesting Season) <br />Ecological Associates Inc. (EAI) will provide sea turtle nesting surveys per Florida Fish and <br />Wildlife Conservation Commission (FWC) and DEP-permit requirements. ATM will provide the <br />County will all reports provided by EAI. ATM will coordinate efforts and review EAI -provided data <br />prior to distribution. <br />Task 8 Agency Coordination and Project Administration <br />Under this task, ATM will coordinate with federal and state regulatory agencies on key project <br />issues and overall satisfaction of permit -required submittals. Quality control and quality <br />assurance will ensure that all submittals and agency coordination meet ATM's and the County's <br />standards for reporting. All documents will be peer-reviewed intemally by ATM staff, and provided <br />to the County for comment. <br />Future Tasks <br />The issued FDEP and USACE permits require monitoring of the project for a minimum of two <br />additional years for physical monitoring and three additional years for biological monitoring. It is <br />assumed that the monitoring requirements will not change, and estimated fees are based on the <br />relevant tasks of this Scope of Work with a 5% increase to account for estimated increases for <br />labor and equipment rates. <br />