My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/1/1981
CBCC
>
Meetings
>
1980's
>
1981
>
4/1/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:16 AM
Creation date
6/11/2015 12:59:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/01/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE FOLLOWING CHANGE ORDERS SIGNED BY ADMINISTRATOR NELSON <br />PER COMMISSION AUTHORIZATION OF AUGUST 11, 1979, ARE HEREBY MADE A <br />PART OF THE MINUTES: <br />COURTHOUSE - N0, 17 <br />ADMINISTRATION BUILDING - <br />No, <br />21 <br />No. <br />22 <br />No, <br />23 <br />No, <br />25 <br />CHANGE OWNER <br />ARCHITECT <br />❑ <br />❑ <br />ORDER CONTRACTOR <br />[] <br />FIELD <br />AIA DOCUMENT G701 OTHER <br />❑ <br />PROJECT: Indian River County <br />(name, address) County Courthouse <br />TO (Contractor) <br />F <br />Reinhold Construction Inc <br />P.O,Box 666 <br />Cocoa, FL 32922 <br />CHANGE ORDER NUMBER: 17 <br />ARCHITECT'S PROJECT NO:9364 <br />CONTRACT FOR: Additions & Renovations <br />L CONTRACT DATE: 4-2-80 <br />You are directed to make the following changes in this Contract: <br />CP -36 At the owners request. <br />Provide Sign to be posted outside of door to Machine Room #1 102 <br />to read "DANGER -ELECTRICAL FQUIPMFNT-APTHORIZED PERSONS ONLY" <br />Add one(l) telephone outlet on East wall Room 117and one(1)on East wall <br />Room 118. <br />Sheet E-3 existing to remain. Run conduit in crawl space & then to <br />basement panel board. Surface mounted outlets. <br />The proposed changes in the work may result in additions] time <br />required beyond the contract completion date. Additional time <br />will be added to thae contract that is diredtly related to this <br />change order. The contractor will be paid for the additional required <br />days at the rate of $300.00 (three hundred) per day for fixed <br />overhead costs. <br />$1,036.11 <br />The original Contract Sum was . . . . .$ 689,000.00 <br />Net change by previous Change Orders . . . . . . . . . . . . . . . . . . $ 142, 145.27 <br />The Contract Sum prior to this Change Order was . . . . . . . . . . . . . . $ 831,145.27 <br />The Contract Sum will be (increased) by this Change Order . . . $ 1,036.11 <br />The new Contract Sum including this Change Order will be . . . . . . . . $ 832,181-38 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( -' ) Days. <br />The Date of Completion as of the date of this Change Order therefore is <br />rngNFI t Mt=TrALI= F runny <br />ARCHITECT <br />_1.3.2.0 S. Dixie HI iway <br />Address <br />RMHOI D cnNSTRUCT p INf _ <br />CONTRACT <br />Address <br />JLND IAN R IVFR COUNTY <br />Qy�(r()rR 14th Ave <br />Address <br />DATE <br />AIA DOCUMENT 0701 • CHANGE ORDER APRIL 1970 EDITION • AIAS • m 1970 THE ONE PACE <br />AMERICAN INSTITUTE OF ARCHITECTS, 173S NEW YORK AVE., NW, WASHINGTON, D.C. 20006 <br />MK '46 pAcE213 <br />
The URL can be used to link to this page
Your browser does not support the video tag.