D. Contractor shall reimburse the Owner for additional engineering and/or inspection cost <br />as a result of overtime work in excess of the regular working hours stipulated in Article SC -6.020. <br />Owner's option, overtime costs may either be deducted from the Contractor's mo s incurred <br />request or deducted from the retainage prior to release of final payment. Overtime costs for the <br />At <br />Owner's personnel shall be based on the individual's current overtime wage rate. Overtime costs <br />payment <br />c <br />personnel employed by the Engineer or Owner's independent testing laboratory shall be calculated <br />in accordance with the terms of their respective contracts with the Owner. <br />SC 6.04A.1 Add the following sentence immediately after the existing text in paragraph <br />the General Conditions:6.04 A.1 of <br />Additionally, any and all changes to the Project's critical path must be reflected ected in eac h Project <br />SC -6.04.A.3 Add the following paragraph immediately after paragraph GC -6.04.A.2 of the <br />Conditions: a General <br />Contractor shall give Owner full information in advance as to its plans for performingeach <br />Work. If at any time during the progress of Work, Contractor's actual progress is inadequate <br />meets the requirements of the Contract, Owner may, but is not obligated to, s part o the <br />such event, Contractor acknowledges and agrees that Contractor shall implement s to <br />following remedial actions at the sole cost and expense of Contract so Contractor. In <br />such quantities and crafts as necessary to eliminate the backlog of Work; b In so or all m the <br />Contractor: (a) Increase manpower in <br />of working hours per shift, shifts per working day, working days per week, the amount of con <br />equipment, or any combination of the foregoing to eliminate () crease the number <br />the Work in conformance with the specification requirements. Neither such notice construction <br />the backlog of Work; or (c) Reschedule <br />Owner's failure to issue such notice shall relieve Contractor of its obligation to achieve the <br />Work and rate of progress required by the Contract. Failure of Contra tice by Owner nor <br />of the remedial actions may be grounds for determination by Owner that quality of <br />Contractor to implement some or all <br />prosecuting its Work with such diligence as will assure completion within times specified. Upon such <br />determination, Owner may terminate Contractor's right to proceed with the performance <br />of the <br />Contract, or any separable part thereof, in accordance with the applicable provisions <br />Contract. <br />of this <br />SC -6.06A <br />Delete Paragraph 6.06A of the General Conditions in its entirety and replace with the following: <br />A. Contractor shall not employ any Subcontractor, Supplier or other person or <br />(including those who are to furnish the principal items of materials or equipment), whether initially <br />as a substitute, against whom Owner may have reasonable objection organization, <br />Subcontractor, Supplier or other person or organization by Owner shall not c r or <br />any right of Owner- to reject defective Work. Contra c -tor not tor shall J be required to employ any <br />'Acceptance of any <br />Subcontractor, Supplier or other person or organization against who constitute a waiver of <br />Objection. m Contractor has reasonable <br />SC -6.066 Delete Paragraph 6.066 of the General Conditions in its entirety. <br />SC -6.08 Delete Paragraph 6.08 of the General Conditions in its entirety and replace with the <br />following: <br />