Laserfiche WebLink
CERTIFICATE OF SUBSTANTIAL COMPLETION <br />PROJECT Brine Line Conversion To A Potable Water Main — 77th Street <br />DATE OF ISSUANCE <br />OWNER Indinn Rivcr (`--4.. <br />OWNER's Contract No. SBS Project No. 08-091 <br />CONTRACTOR ENGINEER Schulke Bittle &Stoddard LLC <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or to <br />the following specified parts thereof: <br />To <br />And To <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A_tentative-list of- items- be -completed -or corrected is -attached hereto. This list may not be all= <br />inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to <br />complete all the Work in accordance with the contract Documents. The items in the tentative list <br />shall be completed or corrected by CONTRACTOR within <br />Substantial Completion. Days of the above date of <br />EJCDC No. C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br />General Contractors of America. <br />00800-31 <br />