My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF SUBSTANTIAL COMPLETION <br />PROJECT Brine Line Conversion To A Potable Water Main — 77th Street <br />DATE OF ISSUANCE <br />OWNER Indinn Rivcr (`--4.. <br />OWNER's Contract No. SBS Project No. 08-091 <br />CONTRACTOR ENGINEER Schulke Bittle &Stoddard LLC <br />This Certificate of Substantial Completion applies to all Work under the Contract Documents or to <br />the following specified parts thereof: <br />To <br />And To <br />OWNER <br />CONTRACTOR <br />The Work to which this Certificate applies has been inspected by authorized representatives of <br />OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially <br />complete in accordance with the contract Documents on <br />DATE OF SUBSTANTIAL COMPLETION <br />A_tentative-list of- items- be -completed -or corrected is -attached hereto. This list may not be all= <br />inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to <br />complete all the Work in accordance with the contract Documents. The items in the tentative list <br />shall be completed or corrected by CONTRACTOR within <br />Substantial Completion. Days of the above date of <br />EJCDC No. C-700 (2002 Edition) <br />Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated <br />General Contractors of America. <br />00800-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.