My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Completion: <br />a. Before ENGINEER issues a Certificate of Substantial Completion, submit to <br />CONTRACTOR a list of observed items requiring completion or correction. <br />b. Conduct final inspection in the company of ENGINEER, OWNER and <br />CONTRACTOR and prepare a final list of items to be completed or <br />corrected. <br />C. Verify that all items on final list have been completed or corrected and make <br />recommendations to ENGINEER concerning acceptance. <br />C. LIMITATIONS OF AUTHORITY <br />Except upon written instructions of ENGINEER, Resident Project Representative: <br />1. Shall not authorize any deviation from the Contract Documents or approve any <br />substitute materials or equipment. <br />2. Shall not exceed limitations on ENGINEER'S authority as set forth in the Contract <br />Documents. <br />3.- Shall not undertake any of the responsibilities of CONTRACTOR, Subcontractors or <br />CONTRACTOR'S superintendent, or expedite the Work. <br />4. Shall not advise on or issue directions relative to any aspect of the means, methods, <br />techniques, sequences or procedures of construction unless such is specifically <br />called for in the Contract Documents. <br />5. Shall not advise on or issue directions as to safety precautions and programs in <br />connection with the Work. <br />6. Shall not authorize OWNER to occupy the Project in whole or in part. <br />7. Shall not participate in specialized field or laboratory tests. <br />*END OF SECTION* <br />00800-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.