Laserfiche WebLink
PART 1 -- GENERAL <br />1.01 LOCATION OF WORK <br />The Brine Line main is located on 77th St., and runs from the North County RO WTP, <br />east along 77th St., then runs north on Old Dixie Hwy, east and then north from 84th St to <br />Sunset Ave, then east on CR510 to the Indian River Lagoon, where it discharges into <br />the Lagoon. <br />The proposal herein includes converting only the first 1150 ft east of the WTP along 77th <br />St.. The main will be connected to an existing 30" water main on 58th Ave, at the <br />intersection of 58th Ave and 77th St. <br />1.02 DESCRIPTION OF WORK <br />IRCDUS proposes to convert approximately 1150 ft. of a 16" diameter Brine Line <br />Transmission main to a Domestic Water Use Transmission and Distribution main. <br />The Brine Line main is located on 77th St., and runs from the North County ROWTP, <br />east along 77th St., then runs north on Old Dixie Hwy, east and then north from 84th St to <br />Sunset Ave, then east on CR510 to the Indian River Lagoon, where it discharges into <br />the Lagoon. <br />The proposal herein includes converting only the first 1150 ft east of the WTP along 77th <br />St. The main will be connected to an existing 30" water main on 58th Ave, at the <br />intersection of 58th Ave and 77th St. <br />The contract also requires the converted utility main to be cleaned, pressure <br />tested, disinfected, and tested for contaminants (chemical, viral, biological), and <br />also requires the construction of: <br />• Connection to an existing 30" potable water main (30" x 16" tapping <br />sleeve and 16" valve) <br />• Directional bore 88 LF of 16" HDPE water main beneath 58th Avenue <br />• Construction of approximately 67 LF of new 16" PVC potable water main <br />• Construction of two (2) fire hydrant assemblies <br />The construction of the utility improvements described above shall also consist <br />of, but not limited to: resetting of signs, mailboxes, and other existing facilities <br />disturbed during construction; utilities exploration; coordination with any <br />permitting agencies; trenching; clearing and tree removal; dewatering; <br />installation of pipe with fittings and all appurtenances; valves, fire hydrant <br />assemblies; wet taps; restrainers; air release valves; line stops; soil compaction; <br />01000 Summary Of Work.doc <br />ninnn - i <br />