My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 1 -- GENERAL <br />1.01 LOCATION OF WORK <br />The Brine Line main is located on 77th St., and runs from the North County RO WTP, <br />east along 77th St., then runs north on Old Dixie Hwy, east and then north from 84th St to <br />Sunset Ave, then east on CR510 to the Indian River Lagoon, where it discharges into <br />the Lagoon. <br />The proposal herein includes converting only the first 1150 ft east of the WTP along 77th <br />St.. The main will be connected to an existing 30" water main on 58th Ave, at the <br />intersection of 58th Ave and 77th St. <br />1.02 DESCRIPTION OF WORK <br />IRCDUS proposes to convert approximately 1150 ft. of a 16" diameter Brine Line <br />Transmission main to a Domestic Water Use Transmission and Distribution main. <br />The Brine Line main is located on 77th St., and runs from the North County ROWTP, <br />east along 77th St., then runs north on Old Dixie Hwy, east and then north from 84th St to <br />Sunset Ave, then east on CR510 to the Indian River Lagoon, where it discharges into <br />the Lagoon. <br />The proposal herein includes converting only the first 1150 ft east of the WTP along 77th <br />St. The main will be connected to an existing 30" water main on 58th Ave, at the <br />intersection of 58th Ave and 77th St. <br />The contract also requires the converted utility main to be cleaned, pressure <br />tested, disinfected, and tested for contaminants (chemical, viral, biological), and <br />also requires the construction of: <br />• Connection to an existing 30" potable water main (30" x 16" tapping <br />sleeve and 16" valve) <br />• Directional bore 88 LF of 16" HDPE water main beneath 58th Avenue <br />• Construction of approximately 67 LF of new 16" PVC potable water main <br />• Construction of two (2) fire hydrant assemblies <br />The construction of the utility improvements described above shall also consist <br />of, but not limited to: resetting of signs, mailboxes, and other existing facilities <br />disturbed during construction; utilities exploration; coordination with any <br />permitting agencies; trenching; clearing and tree removal; dewatering; <br />installation of pipe with fittings and all appurtenances; valves, fire hydrant <br />assemblies; wet taps; restrainers; air release valves; line stops; soil compaction; <br />01000 Summary Of Work.doc <br />ninnn - i <br />
The URL can be used to link to this page
Your browser does not support the video tag.