My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.09 UNIT PRICE CHANGE ORDER <br />A. Content of Change Orders will be based on, either: <br />1. Engineer definition of the scope of the required changes. <br />2. Contractor's Proposal for a change, as recommended by Engineer. <br />3. Survey of completed work <br />B. The amount of the unit prices shall be: <br />1. Those stated in the Agreement. <br />2. Those mutually agreed upon between Owner and Contractor. <br />C. When quantities of each of the items affected by the Change Order can be <br />determined prior to start of the work: <br />1. Owner and Engineer will sign and date the Change Order as <br />authorization for Contractor to proceed with the changes. <br />2. Contractor shall sign and date the Change Order to indicate agreement <br />with the terms therein. <br />D. When quantities of the items cannot be determined prior to start of the work: <br />1. Engineer or Owner will issue a Change Order directing Contractor to <br />proceed with the change on the basis of unit prices, and will cite the <br />applicable unit prices. <br />2. At completion of the change, Engineer will determine the cost of such <br />work based on the unit prices and quantities used. <br />a• Contractor shall submit documentation to establish the number <br />of units of each item and any claims for a change in Contract <br />Time. <br />3. Engineer will sign and date a second Change Order to establish the <br />change in Contract Sum and in Contract Time. <br />4. Owner and Contractor will sign and date the second Change Order to <br />indicate their agreement with the terms therein. <br />1.10 TIME AND MATERIAL / FORCE ACCOUNT CHANGE ORDER / CONSTRUCTION <br />AUTHORIZATION <br />A. Engineer and owner will issue a Work Directive Change directing Contractor to <br />Proceed with the changes on a time -and -material / force account basis. <br />B. At completion of the change, Contractor shall submit itemized accounting and <br />supporting data as provided in the Article "Documentation of Proposals and <br />Claims" of this section. <br />C. Engineer will determine the allowable cost of such work, as provided in General <br />Conditions and Supplementary Condition. <br />01153-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.