Laserfiche WebLink
Substantial Completion. <br />(c) From 75 calendar days to 90 calendar days from the effective date of Notice to <br />Proceed, the CONTRACTOR shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment and material from project site. <br />3. Perform -contract closeout procedures. <br />Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br />Completion. <br />6. The following documents are attached to and made a part of this Bid: <br />(a) Certificate of Compliance with the Florida Trench Safety Act (Section 00310) <br />(b) Local Business Certification Form (Section 00320) <br />(c) Disclosure of Relationships (Section 00452) <br />(d) General Information Required for Bidders (Section 00456) <br />7. The terms used in this Bid, which are defined in the General Conditions of the <br />Construction Contract included as part of the Contract Documents, have the <br />meanings assigned to them in the General Conditions. Contractor acknowledges <br />the insurance requirements of Section 00700 as amended by Section 00800 and <br />any other addendums and agrees to provide said insurance upon award of <br />contract. <br />BIDDER INFORMATION: <br />SUBMITTED ON: (DATE) <br />SUBMITTED BY: (NAME OF BIDDER) <br />(STREET ADDRESS) <br />(CITY, STATE, ZIP) <br />(PHONE #) <br />(FAX #) <br />(E-MAIL) <br />(FEDERAL -ID #) <br />(FLORIDA LICENSE #) <br />SIGNED BY: (PRINTED NAME) <br />(TITLE) <br />(SIGNATURE) <br />00300-4 <br />