My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.03 MARKING DEVICES <br />A. Provide felt tip marking pens for recording information in the color red. <br />1.04 RECORDING (SEE ALSO SPECIAL CONDITIONS) <br />A. Label each document "PROJECT RECORD" in neat large printed letters. <br />B. Record information concurrently with construction progress. DO NOT conceal <br />or backfill any work until required information is recorded. <br />C. Drawings: Legibly mark to record actual construction: <br />1. Depths of various elements of construction in relation to N.G.V.D. 1929. <br />2. Horizontal and vertical locations of underground utilities and <br />appurtenances, referenced to permanent surface improvements. <br />3. Location of internal utilities and appurtenances concealed in the <br />construction, referenced to visible and accessible features of the <br />structure. <br />4. Field changes of dimension and detail <br />5. Changes made by field order or by change order. <br />6. Details not on original contract drawings. <br />D. Specifications and Addenda: Legibly mark each section to record: <br />1. Manufacturer, trade name, catalog number and supplier of each <br />product and item of equipment actually installed. <br />2. Changes made by field order or by change order. <br />1.05 SUBMITTAL <br />A. At Contract close-out, deliver Record Documents to Engineer for the Owner <br />B. Accompany submittal with transmittal letter in duplicate, containing: <br />1. Date <br />2. Project title and number <br />3. Contractor's name and address <br />4. Title and number of each Record Document <br />5. Signature of Contractor or his authorized representative <br />01720-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.