Laserfiche WebLink
10. All as-builts shall clearly depict as -built utility lines that were <br />constructed along with their respective easement (if required). As- <br />builts will not be accepted unless the verbiage "Proposed" and/or "To <br />Be constructed" have been revised to read "AS -Built". As -built <br />Construction drawings with, to be constructed terminology, will not <br />be accepted. <br />11. All as-builts shall be certified by the contractor's surveyor. <br />12. All utility as -built construction located within the rights-of-way, <br />easements and alike shall be tied to the respective rights -of way, <br />easements, etc., every 1,000 feet and change of direction. <br />13. All fire hydrants, valves, Tee's, crosses, A.R-V.'s and pipeline changes <br />in direction (fittings), shall be located with state plane coordinates <br />and shall be identified on the as-builts. <br />14. All as-builts shall be complete and approved before commencement <br />of field test. <br />PART 2 -- PRODUCTS <br />Not applicable <br />PART 3 -- EXECUTION <br />Not applicable <br />** END OF SECTION ** <br />01720-5 <br />K <br />