My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Date of beginning of warranty, bond or service and maintenance <br />contract. <br />S. Duration of warranty, bond or service maintenance contract. <br />6. Provide information for Owner's personnel: <br />a. Proper procedure in case of failure <br />b. Instances which might affect the validity of warranty bonds. <br />7. Contractor, name of responsible principal, address and telephone <br />number. <br />1.04 FORM OF SUBMITTALS <br />A. Prepare in duplicate packets. <br />B. Format: <br />1. Size 8-1/2" X 11" punched sheets for 3 -ring binder <br />a. Fold larger sheets to fit into binders <br />2. Cover: Identify each packet with typed or printed title "WARRANTIES <br />AND BONDS." List: <br />a. Title of project <br />b. Name of Contractor <br />C. Binders: Commercial quality, three-ring, with durable and cleanable plastic <br />cover. <br />1.05 TIME OF SUBMITTALS <br />A. Make submittals within ten days after Date of Substantial Completion, prior to <br />final request for payment. <br />B. For items of work, where acceptance is delayed materially beyond the Date of <br />Substantial Completion, provide updated submittal within ten days after <br />acceptance, listing the date of acceptance as the start of the warranty period. <br />1.06 SUBMITTALS REQUIRED <br />A. Submit warranties, bonds, and service and maintenance contracts as specified in <br />the respective sections of Specifications, as appropriate. <br />PART 2 -- PRODUCTS <br />Not applicable <br />PART 3 -- EXECUTIVE <br />01740 Warranties and Bonds.doc <br />01740-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.