My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br />standards, September 1996". These specifications included applicable <br />references to AWWA standards and Florida administrative code. <br />That portion of the existing pipeline proposed to be converted is <br />butt fusion welded HDPE pipe, and does not contain any fittings, <br />valves or other appurtenances along its length. Therefore, the only <br />existing component -is the HDPE pipe. There are not any gasketted <br />joints or pipe runs or fittings that are cement lined. <br />All new pipe and fittings will be constructed in accordance with <br />current standards. New facilities are proposed at the connection <br />point of the 16" converted main to an existing 30" water main <br />where connection will be made with 148 If of new 16" water main; <br />at a mid point where a fire hydrant will be cut into the existing 16" <br />converted main; and at the end of the existing 16" converted <br />pipe, where a t, 8" branch line, valve, plug and blow -off will be <br />constructed. (See plans and specifications) <br />3. The water main shall be laid to provide a horizontal distance in <br />accordance with 62-555.314(5): <br />The existing pipeline has been excavated and located, and has <br />been documented in the field. The pipe was found to <br />have the following separation: <br />10.2 ft, 7.0 ft, and 7.7 ft. Of separation from the force main lying <br />south of the pipeline. A min. Of 6 ft is required. <br />11.7 ft., 3.7 ft., and 13.7 ft. of separation from the reclaimed water <br />main lying north of the pipeline. A min. Of 3 ft. is required. (Part iii <br />62-610 fac). <br />An as -built of the existing main was prepared upon the completion <br />of its construction in 1996, which confirms the location and <br />separation from the force main to the north. <br />All new mains are specified to meet the standards (see plans and <br />specifications). <br />The contractor shall further document the pipe condition during construction <br />at all locations where pipe is to be excavated (connection point, flushing point, <br />fire hydrant cut -ins, conflict locations). Documentation shall include as -built <br />locations of depth, separation from other utilities, photos of pipe, markers, <br />etc. <br />02001-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.