My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection of the internal pipe and at existing butt joints. This can <br />be accomplished when necessary excavation, cutting and <br />installation of the poly pig launching assembly at the upstream <br />end, and installation of the flushing assembly at the down stream <br />end of the pipe is commenced. The pipe shall be cut near an <br />existing butt joint, so both the internal wall and joint of the pipe can <br />be evaluated. <br />the presence of scale, grit or other foreign material shall be <br />documented via field notes, photographs, and specimens scraped <br />or otherwise removed from the wall and joint of the pipe and <br />samples shall be laboratory tested to determine its chemical and <br />biological constituents. The lab test results shall be evaluated and <br />provided to IRC and the engineer. <br />b• Clean the main - The contractor shall evaluate the internal <br />condition, residue / scale found, lab samples provided, and <br />recommend the type and frequency of poly pigs to be <br />incorporated into the system, and other cleaning methods that <br />may be necessary. <br />the existing main shall be cleaned of all contaminants prior to <br />bacteriological evaluation with the use of the controlled and <br />pressurized passage through the pipe with a series of hydraulic or <br />pneumatic poly urethane plugs of varying dimensions, coatings <br />and densities. (poly pigs). <br />e <br />the type and size of the poly pigs shall be that which will thoroughly o <br />clean the pipe of all material, sand, grit, gravel, stones, fluids, debri, threats to <br />sanitation, and other items that could generally be construed as foreign <br />material and that which would not be found in a properly cleaned system. <br />The cleaning shall provide a smooth interior periphery of the pipe and will <br />end result in a pipe virtually free of any material and fluids. <br />Poly Pigs are available with abrasive qualities, brushes, and <br />coatings. The type and frequency of use shall be determined in the <br />field based on an evaluation of the pipe interior. <br />The pipe shall be flushed of all contaminants by the utility <br />contractor. <br />02001-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.