My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rest of the tree from ground level to a height of six feet (6'). Spraying of <br />damaged trees shall be completed within five (5) days after injury occurs. <br />2. Hardwood (all species except pine) <br />applicationAn <br />paint shall be applied to the dam ged arrea.f <br />The paint ashall betree <br />in <br />sufficient quantity so as to form an airtight seal. Spraying or painting pofthe <br />damaged trees shall be performed within twenty-four (24) hours after the injury <br />occurs. In case of damage to "specimen" hardwoods, the inspecting Engineer <br />may require the Contractor to retain a skilled and licensed tree surgeon to <br />properly treat the damaged tree. No compensation shall be made to <br />Contractor for treating damaged trees. the <br />PART 3 -- EXECUTION <br />3.01 GENERAL <br />Protect tree root system from damage due to noxious materials in solution caused <br />run-off or spoilage during mixing and placement of construction mat ri is or by <br />from stored materials. Protect roots stems from floodin a a. ' <br />resulting from dewateringoperations. <br />drai„agg <br />perations. g. erosion, or excessive wetting <br />3.02 REPAIR AND REPLACEMENT OF TREES <br />A. Repair trees damaged by construction operations, in a manner acce tab <br />the Engineer. Make repairs p le to <br />after damage occurs to prevent <br />progressive deterioration of damaged trees. <br />B. Remove and replace dead and damaged trees which are determined b th <br />surgeon to be incapable of restoration to normal growth pattern. y e tree <br />C. If trees over six inches in caliper measurement (taken 12 inches abovegrade) <br />are required to be replaced, provide new trees of six inches caliper size, and of <br />the species selected by the Engineer. <br />3.03 DISPOSAL <br />Removal from Owner's property: Remove excess excavation, displaced trees an <br />trimmings, and dispose of off the Owner's property in a manner approved b l <br />agencies yal <br />' loc <br />** END OF SECTION ** <br />02115 Tree Protection and Drilling.doc <br />02115-2 <br />9 <br />Q <br />a <br />
The URL can be used to link to this page
Your browser does not support the video tag.