My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530 — EJCDC STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE <br />THIS AGREEMENT ("Agreement" or "Contract"), dated the 3rd day of November in the <br />year 2009 by and between Indian River County, a political subdivision of the State of Florida <br />(hereinafter called OWNER) and Masci Corporation_(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish <br />and complete all of the necessary labor, material, and equipment to perform the work <br />as specified or indicated in the Contract Documents. The work is generally described <br />as follows: <br />IRCDUS proposes to convert approximately 1150 ft. of a 16" diameter Brine Line <br />Transmission main to a Domestic Water Use Transmission and Distribution main. <br />The Brine Line main is located on 77°i St., and runs from the North County ROWTP, east <br />along 77th St., then runs north on Old Dixie Hwy, east and then north from 84th St to Sunset <br />Ave, then east on CR510 to the Indian River Lagoon, where it discharges into the Lagoon. <br />The proposal herein includes converting only the first 1150 ft of the main east of the WTP <br />along 77h St.. The main will be connected to an existing 30" water main on 581' Ave, at the <br />intersection of 58th Ave and 77h St. <br />The contract also requires the converted utility main to be cleaned, pressure tested, <br />disinfected, and tested for contaminants (chemical, viral, biological), and also <br />requires the construction of: <br />• Connection to an existing 30" potable water main (30" x 16" tapping sleeve <br />and 16" valve) <br />• Directional bore 88 LF of 16" HDPE water main beneath 58`" Avenue <br />• Construction of approximately 67 LF of new 16" PVC potable water main <br />• Construction of two (2) fire hydrant assemblies <br />The construction of the utility improvements described above shall also consist of, <br />but not limited to: resetting of signs, mailboxes, and other existing facilities <br />disturbed during construction; utilities exploration; coordination with any permitting <br />agencies; trenching; clearing and tree removal; dewatering; installation of pipe with <br />fittings and all appurtenances; valves, fire hydrant assemblies; wet taps; restrainers; <br />air release valves; line stops; soil compaction; disinfection; testing; (including <br />providing temporary jumper or another approved method for disinfection and <br />flushing); road restoration; regrading and grassing (sod); and traffic control. <br />00530-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.