My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-280
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 3:11:30 PM
Creation date
10/5/2015 9:04:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/06/2009
Control Number
2009-280
Agenda Item Number
8.L.
Entity Name
Masci Corporation
Subject
Potable Water Main 77th. Street
Area
77th St.
Project Number
UCP 3086
Bid Number
2009064
Supplemental fields
SmeadsoftID
8783
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
---- -- - ECT-f0N-U061-0 - - — <br />PERFORMANCE BOND <br />THIS IS AN INSTRUCTION, NOT PART OF THE BOND. The bond must state on its front <br />page: the name, principal business address, and phone number of the contractor, the surety, <br />the owner of the property being improved, and, if different from the owner, the contracting <br />public entity; the contract number assigned by the contracting public entity; and a description of <br />the project sufficient to identify it, such as a legal description or the street address of the <br />property being improved, and a general description of the improvement, and -the bond number. <br />KNOW ALL MEN BY THESE PRESENTS: <br />BY THIS BOND, we <br />Principal, and as <br />corporation, as Surety, are held and firmly bound unto the County of Indian River, Florida, in the <br />sum of Dollars ($ <br />), amounting to 100% of <br />the total bid price. For the payment of said sum we bind ourselves, our heirs, executors, <br />administrators and assigns, jointly and severally, for the faithful performance of a certain written <br />Contract, dated the day of , 20_, entered into between the <br />Principal and the County of Indian River, for: <br />Project Name: "Brine Line Conversion To A Potable Water Main – 77th <br />Street." <br />County Project Bid Number: 2009064 <br />County UCP Number: 3086 <br />Project Address: 7777_ <br />Project Description: <br />CONTRACTOR shall complete all work as specified or indicated in the Contract <br />Documents. The work is generally described as follows which shall include, but is not <br />necessarily limited to the following: <br />IRCDUS proposes to convert approximately 1150 ft. of a 16" diameter Brine Line <br />Transmission main to a Domestic Water Use Transmission and Distribution main. <br />The Brine Line main is located on 77th St., and runs from the North County ROWTP, <br />east along 77 th St., then runs north on Old Dixie Hwy, east and then north from 84th St to <br />Sunset Ave, then east on CR510 to the Indian River Lagoon, where it discharges into <br />the Lagoon. <br />The proposal herein includes converting only the first 1150 ft east of the WTP along 77th <br />St.. The main will be connected to an existing 30" water main on 58th Ave, at the <br />intersection of 581h Ave and 77th St. <br />The contract also requires the converted utility main to be cleaned, pressure <br />tested, disinfected, and tested for contaminants (chemical, viral, biological), and <br />also requires the construction of: <br />Connection to an existing 30" potable water main (30" x 16" tapping <br />sleeve and 16" valve) <br />Directional bore 88 LF of 16" HDPE water main beneath 58th Avenue <br />00610-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.