Laserfiche WebLink
---- -- - ECT-f0N-U061-0 - - — <br />PERFORMANCE BOND <br />THIS IS AN INSTRUCTION, NOT PART OF THE BOND. The bond must state on its front <br />page: the name, principal business address, and phone number of the contractor, the surety, <br />the owner of the property being improved, and, if different from the owner, the contracting <br />public entity; the contract number assigned by the contracting public entity; and a description of <br />the project sufficient to identify it, such as a legal description or the street address of the <br />property being improved, and a general description of the improvement, and -the bond number. <br />KNOW ALL MEN BY THESE PRESENTS: <br />BY THIS BOND, we <br />Principal, and as <br />corporation, as Surety, are held and firmly bound unto the County of Indian River, Florida, in the <br />sum of Dollars ($ <br />), amounting to 100% of <br />the total bid price. For the payment of said sum we bind ourselves, our heirs, executors, <br />administrators and assigns, jointly and severally, for the faithful performance of a certain written <br />Contract, dated the day of , 20_, entered into between the <br />Principal and the County of Indian River, for: <br />Project Name: "Brine Line Conversion To A Potable Water Main – 77th <br />Street." <br />County Project Bid Number: 2009064 <br />County UCP Number: 3086 <br />Project Address: 7777_ <br />Project Description: <br />CONTRACTOR shall complete all work as specified or indicated in the Contract <br />Documents. The work is generally described as follows which shall include, but is not <br />necessarily limited to the following: <br />IRCDUS proposes to convert approximately 1150 ft. of a 16" diameter Brine Line <br />Transmission main to a Domestic Water Use Transmission and Distribution main. <br />The Brine Line main is located on 77th St., and runs from the North County ROWTP, <br />east along 77 th St., then runs north on Old Dixie Hwy, east and then north from 84th St to <br />Sunset Ave, then east on CR510 to the Indian River Lagoon, where it discharges into <br />the Lagoon. <br />The proposal herein includes converting only the first 1150 ft east of the WTP along 77th <br />St.. The main will be connected to an existing 30" water main on 58th Ave, at the <br />intersection of 581h Ave and 77th St. <br />The contract also requires the converted utility main to be cleaned, pressure <br />tested, disinfected, and tested for contaminants (chemical, viral, biological), and <br />also requires the construction of: <br />Connection to an existing 30" potable water main (30" x 16" tapping <br />sleeve and 16" valve) <br />Directional bore 88 LF of 16" HDPE water main beneath 58th Avenue <br />00610-1 <br />