My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/15/1981
CBCC
>
Meetings
>
1980's
>
1981
>
4/15/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:17 AM
Creation date
6/11/2015 1:02:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/15/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V V <br />Adjustments per Bid Item: <br />1.0 Floridan Aquifer Test Production Well <br />1.1 12" casing <br />1.2 12" open hole <br />1.3 cement <br />1.4 development <br />1.5 pump test <br />1.6 standby <br />-17 <br />ft. <br />+17 <br />ft. <br />-176.4 <br />c.f. <br />-14 <br />hrs. <br />--- <br />hrs. <br />+3.5 <br />hrs. <br />(680.00) <br />255.00 <br />(2,646.00) <br />(700.00) <br />Item No. 1.0 Adjustment <br />2.0 Florida Aquifer Monitor Well <br />490.00 <br />2.1 <br />10" casing <br />-5 <br />ft. <br />(175.00) <br />2.2 <br />10" open hole <br />+5 <br />ft. <br />75.00 <br />2.3 <br />2" casing <br />+2 <br />ft. <br />4.00 <br />2.4 <br />2" screen <br />--- <br />ft. <br />----- <br />2.5 <br />cement <br />+41 <br />c.f. <br />1,025.00 <br />2.6 <br />gravel <br />+.25 <br />c.y. <br />13.50 <br />2.7 <br />sand <br />--- <br />c•Y• <br />----- <br />2.8 <br />development <br />-5.25 <br />hrs. <br />(262.50) <br />2.9 <br />standby <br />+.25 <br />hrs. <br />35.00 <br />Item No. 2.0 <br />Adjustment <br />3.0 Floridan Aquifer Observation Production Well <br />3.1 <br />12" casing <br />-17 <br />ft. <br />(680.00) <br />3.2 <br />12" open hole <br />+17 <br />ft. <br />255.00 <br />3.3 <br />cement <br />-243 <br />c.f. <br />(3,645.00) <br />3.4 <br />development <br />-15 <br />hrs. <br />(750.00) <br />3.5 <br />pump test <br />--- <br />hrs. <br />------ <br />3.6 <br />standby <br />+2 <br />hrs. <br />280.00 <br />Item No. 3.0 <br />Adjustment <br />$ (3,281.00) <br />+ 715.00 <br />$ (4,540.00) _ <br />TOTAL CONTRACT ADJUSTMENT $ (7,106.00) <br />60 <br />4.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.